128 Main Street
Carlos Hanzi has applied to the Ashland Planning Board for a Site Plan Review under Sections 8.3 and 9.4 of the Ashland Zoning Bylaws to construct a mixed-use building with 17 residential units and commercial space and parking on the street level. The property is located at 128 Main Street in the ADD-C District. The Planning Board will hold a public discussion at 7:45 PM on September 28, 2017 in the Board of Selectmen’s Room, Ashland Town Hall, 101 Main Street, Ashland, Massachusetts.
The lot currently contains a 2.5 story mixed-use structure.
The application has been revised several times. Check the Plans for the latest information.
Location
Streetview
Information & Plans
- Proposed Floor Plans - 128 Mai
- Proposed Site Plan - 128 Main
- Proposed Plot Plan - 128 Main
- Existing Plot Plan - 128 Main
- Supplemental Information - 128
- Application - 128 Main
- Building Footprint 10.25.17
- Revised Streetfront Elevation 11.27.17
- Revised Floor Plan 11.27.17
- Revised Elevation 11.27.17
- Facade 10.25.17
- 128 Main Parking Layout 11.30.17
- 128 Main Fenestration Numbers 11.30.17
- 128 Main Revised Layout Plan 12.07.17
- 128 Main Revised Plans 11.30.17
- 128 Main Landscape Layout 12.11.17
- 128 Main Roof 12.11.17
- 128 Main Street 12.11.17
- 128 Main_Elevations 12.11.17
- Rendered Elevations 25apr2018
- Siteplan and First Floor Layout 25apr2018
- Second and Third Floor Plan 25apr2018
- Building Info 25apr2018
- Building Info DRC 8May2018
- Ground Floor DRC 8May2018
- Upper Floors DRC 8May2018
- Landscape Plan DRC 8May2018
- Elevations DRC 8May2018
- DRC Final Report - 21June2018
- Rendering 1 - looking NE 18Jul
- Rendering 2 - looking E 18July
- September 6 Rendering #2 - looking south
- September 6 Rendering #3 looking north
- September 6 - Architectural ground floor
- September 6 Architectural 2nd and 3rd floor
- September 6 Architectural Roof Plan
- September 6 Elevations
- September 6 Landscape Plan
- August 11 Stormwater Application -currently being revised per comments
- August 11 Stormwater Plan -currently being revised per comments
- 128 Main Decision
- August 23 GCG stormwater peer review
- Rendering 3 - looking SE 18July2018
- Structural Narrative
- Stormwater Permit Information August 11, 2018
- Drainage/Stormwater Plans dated July 26, 2018
- September 6 Proposed Site Plan
- September 6 Rendering #1 - front