Weekly Construction Update 12/13/18

Neighbors,

Below please find an update of the activity at the 399 Binney Street construction site anticipated for next week. Please reach out to a project team member directly with specific concerns. We will work with you to address specific issues. Working hours are Monday through Friday 7a - 6p (note a variance has been granted for material deliveries until 8p) and Saturday 9a-6p.  Please do not hesitate reaching out to any member of the team with any questions, concerns or comments.

The 399 Binney Street site will be open on Saturday 12/22/18 with work beginning at 9a.

Work continues with the City of Cambridge and Divco West replacing a drain line and water line in Binney Street from Cardinal Medeiros to the railroad tracks. If you have any questions about the work within the street over the next few weeks, please refer to the DPW project website (below) with questions.

 

https://www.cambridgema.gov/theworks/cityprojects/detail.aspxpath=%2fsitecore%2fcontent%2fhome%2ftheworks%2fcityprojects%2f2018%2fbinneyststormwater

 

The Cinema is open.

  • There are two police details on site between 7a – 3p Monday – Friday. They are stationed on Binney and Cardinal Medeiros and are tasked with assisting pedestrians cross the streets safely.
  • Wayfinding for cinema and day care is installed. The plaza is closed to all pedestrians. All patrons of the cinema and daycare need to enter through the main garage entrance and follow signage and striping.

The following activity involves the use of heavy construction and trucking equipment and will create noise.

  • Trucking for delivery of materials to the site
  • Trucking for removal of materials from the site
  • Mechanical, Electrical and Plumbing installations inside and on the roof of the building
  • Exterior façade installation including lifts (inside the construction fence)
  • Permanent roofing work
  • Sidewalk work around the building
  • Interior fit out work
  • Work on the plaza between the building and the garage will continue. Work includes soil work and installation of underground structures.
  • Garage scrim installation 


Construction Update 12/7/18

Neighbors,

Below please find an update of the activity at the 399 Binney Street construction site anticipated for next week. Please reach out to a project team member directly with specific concerns. We will work with you to address specific issues. Working hours are Monday through Friday 7a - 6p (note a variance has been granted for material deliveries until 8p) and Saturday 9a-6p.  Please do not hesitate reaching out to any member of the team with any questions, concerns or comments.

The 399 Binney Street site will be open on Saturday 12/15/18 with work beginning at 9a.

Work continues with the City of Cambridge and Divco West replacing a drain line and water line in Binney Street from Cardinal Medeiros to the railroad tracks. If you have any questions about the work within the street over the next few weeks, please refer to the DPW project website (below) with questions.

 

https://www.cambridgema.gov/theworks/cityprojects/detail.aspxpath=%2fsitecore%2fcontent%2fhome%2ftheworks%2fcityprojects%2f2018%2fbinneyststormwater

 

The Cinema is open.

  • There are two police details on site between 7a – 3p Monday – Friday. They are stationed on Binney and Cardinal Medeiros and are tasked with assisting pedestrians cross the streets safely.
  • Wayfinding for cinema and day care is installed. The plaza is closed to all pedestrians. All patrons of the cinema and daycare need to enter through the main garage entrance and follow signage and striping.

The following activity involves the use of heavy construction and trucking equipment and will create noise.

  • Trucking for delivery of materials to the site
  • Trucking for removal of materials from the site
  • Mechanical, Electrical and Plumbing installations inside and on the roof of the building
  • Exterior façade installation including lifts (inside the construction fence)
  • Permanent roofing work
  • Sidewalk work around the building
  • Interior fit out work
  • Work on the plaza between the building and the garage will continue
  • Garage scrim installation 


Construction Update 11/29/18

Neighbors,

Below please find an update of the activity at the 399 Binney Street construction site anticipated for next week. Please reach out to a project team member directly with specific concerns. We will work with you to address specific issues. Working hours are Monday through Friday 7a - 6p (note a variance has been granted for material deliveries until 8p) and Saturday 9a-6p.  Please do not hesitate reaching out to any member of the team with any questions, concerns or comments.

The 399 Binney Street site will be open on Saturday 12/1/18 with work beginning at 7a to allow for a crane to be set up.

Note that Binney Street will be closed on 12/1/18.

Work continues with the City of Cambridge and Divco West replacing a drain line and water line in Binney Street from Cardinal Medeiros to the railroad tracks. If you have any questions about the work within the street over the next few weeks, please refer to the DPW project website (below) with questions.

 

https://www.cambridgema.gov/theworks/cityprojects/detail.aspxpath=%2fsitecore%2fcontent%2fhome%2ftheworks%2fcityprojects%2f2018%2fbinneyststormwater

 

The Cinema is open.

  • There are two police details on site between 7a – 3p Monday – Friday. They are stationed on Binney and Cardinal Medeiros and are tasked with assisting pedestrians cross the streets safely.
  • Wayfinding for cinema and day care is installed. The plaza is closed to all pedestrians. All patrons of the cinema and daycare need to enter through the main garage entrance and follow signage and striping.

The following activity involves the use of heavy construction and trucking equipment and will create noise.

  • Trucking for delivery of materials to the site
  • Trucking for removal of materials from the site
  • Mechanical, Electrical and Plumbing installations inside and on the roof of the building
  • Exterior façade installation including lifts (inside the construction fence)
  • Permanent roofing work
  • Interior fit out work
  • Work on the plaza between the building and the garage will continue
  • Garage scrim installation 


Construction Update 11/21/18

Neighbors,

Below please find an update of the activity at the 399 Binney Street construction site anticipated for next week. Please reach out to a project team member directly with specific concerns. We will work with you to address specific issues. Working hours are Monday through Friday 7a - 6p (note a variance has been granted for material deliveries until 8p) and Saturday 9a-6p.  Please do not hesitate reaching out to any member of the team with any questions, concerns or comments.

The 399 Binney Street site will be open on Saturday 12/1/18 with work beginning at 7a to allow for a crane to be set up. Note that Binney Street will be closed on 12/1/18.

The 399 Binney Street site will be closed for Thanksgiving 11/22/18.

Work continues with the City of Cambridge and Divco West replacing a drain line and water line in Binney Street from Cardinal Medeiros to the railroad tracks. If you have any questions about the work within the street over the next few weeks, please refer to the DPW project website (below) with questions.

 

https://www.cambridgema.gov/theworks/cityprojects/detail.aspxpath=%2fsitecore%2fcontent%2fhome%2ftheworks%2fcityprojects%2f2018%2fbinneyststormwater

 

The Cinema is open.

  • There are two police details on site between 7a – 3p Monday – Friday. They are stationed on Binney and Cardinal Medeiros and are tasked with assisting pedestrians cross the streets safely.
  • Wayfinding for cinema and day care is installed. The plaza is closed to all pedestrians. All patrons of the cinema and daycare need to enter through the main garage entrance and follow signage and striping.

The following activity involves the use of heavy construction and trucking equipment and will create noise.

  • Trucking for delivery of materials to the site
  • Trucking for removal of materials from the site
  • Mechanical, Electrical and Plumbing installations inside and on the roof of the building
  • Exterior façade installation including lifts (inside the construction fence)
  • Permanent roofing work
  • Interior fit out work
  • Work on the plaza between the building and the garage will continue
  • Garage scrim installation
  • Garage stair tower painting 


Construction Update 11/16/18

Neighbors,

Below please find an update of the activity at the 399 Binney Street construction site anticipated for next week. Please reach out to a project team member directly with specific concerns. We will work with you to address specific issues. Working hours are Monday through Friday 7a - 6p (note a variance has been granted for material deliveries until 8p) and Saturday 9a-6p.  Please do not hesitate reaching out to any member of the team with any questions, concerns or comments.

The 399 Binney Street site will be open on Saturday 11/17/18 with work beginning at 9a.

The 399 Binney Street site will be closed for Thanksgiving 11/22/18.

Work continues with the City of Cambridge and Divco West replacing a drain line and water line in Binney Street from Cardinal Medeiros to the railroad tracks. If you have any questions about the work within the street over the next few weeks, please refer to the DPW project website (below) with questions.

 

https://www.cambridgema.gov/theworks/cityprojects/detail.aspxpath=%2fsitecore%2fcontent%2fhome%2ftheworks%2fcityprojects%2f2018%2fbinneyststormwater

 

The Cinema is open.

  • There are two police details on site between 7a – 3p Monday – Friday. They are stationed on Binney and Cardinal Medeiros and are tasked with assisting pedestrians cross the streets safely.
  • Wayfinding for cinema and day care is installed. The plaza is closed to all pedestrians. All patrons of the cinema and daycare need to enter through the main garage entrance and follow signage and striping.

The following activity involves the use of heavy construction and trucking equipment and will create noise.

  • Trucking for delivery of materials to the site
  • Trucking for removal of materials from the site
  • Mechanical, Electrical and Plumbing installations inside and on the roof of the building
  • Exterior façade installation including lifts (inside the construction fence)
  • Permanent roofing work
  • Interior fit out work
  • Work on the plaza between the building and the garage will continue
  • Garage scrim installation
  • Garage stair tower painting 


Construction Update 11/9/18

Neighbors,

Below please find an update of the activity at the 399 Binney Street construction site anticipated for next week. Please reach out to a project team member directly with specific concerns. We will work with you to address specific issues. Working hours are Monday through Friday 7a - 6p (note a variance has been granted for material deliveries until 8p) and Saturday 9a-6p.  Please do not hesitate reaching out to any member of the team with any questions, concerns or comments.

The 399 Binney Street site will be open on Saturday 11/10/18 with work beginning at 9a.

Work continues with the City of Cambridge and Divco West replacing a drain line and water line in Binney Street from Cardinal Medeiros to the railroad tracks. If you have any questions about the work within the street over the next few weeks, please refer to the DPW project website (below) with questions.

 

https://www.cambridgema.gov/theworks/cityprojects/detail.aspx?path=%2fsitecore%2fcontent%2fhome%2ftheworks%2fcityprojects%2f2018%2fbinneyststormwater

 

The Cinema is open.

  • There are two police details on site between 7a – 3p Monday – Friday. They are stationed on Binney and Cardinal Medeiros and are tasked with assisting pedestrians cross the streets safely.
  • Wayfinding for cinema and day care is installed. The plaza is closed to all pedestrians. All patrons of the cinema and daycare need to enter through the main garage entrance and follow signage and striping.

The following activity involves the use of heavy construction and trucking equipment and will create noise.

  • Trucking for delivery of materials to the site
  • Trucking for removal of materials from the site
  • Mechanical, Electrical and Plumbing installations inside and on the roof of the building
  • Exterior façade installation including lifts (inside the construction fence)
  • Permanent roofing work
  • Interior fit out work
  • Work on the plaza between the building and the garage will commence
  • Garage scrim installation
  • Garage stair tower painting

Check out the 399 Binney Street project website (see link / url to copy below). Sign up to receive updates, post comments and questions, see the latest renderings.

 

https://courbanize.com/projects/399binney/information

Construction Update 11/1/18

Neighbors,

Below please find an update of the activity at the 399 Binney Street construction site anticipated for next week. Please reach out to a project team member directly with specific concerns. We will work with you to address specific issues. Working hours are Monday through Friday 7a - 6p (note a variance has been granted for material deliveries until 8p) and Saturday 9a-6p.  Please do not hesitate reaching out to any member of the team with any questions, concerns or comments.

The 399 Binney Street site will be open on Saturday 11/3/18 with work beginning at 9a.

Binney Street is scheduled to be closed Saturday 11/3/18 for crane set up.

Work continues with the City of Cambridge and Divco West replacing a drain line and water line in Binney Street from Cardinal Medeiros to the railroad tracks. If you have any questions about the work within the street over the next few weeks, please refer to the DPW project website (below) with questions. Note that all of the projects are working together to find the best options for ensuing pedestrian safety in this busy area.

 

https://www.cambridgema.gov/theworks/cityprojects/detail.aspxpath=%2fsitecore%2fcontent%2fhome%2ftheworks%2fcityprojects%2f2018%2fbinneyststormwater


Building demolition, site work and exploration of the former Met Pipe site will commence in the coming week and is expected to last 6-8 weeks. This work will take place during normal business hours and noise generating activities will include, but not be limited to, drilling test wells, heavy equipment to demolish the buildings, generators for power, loading materials for offsite removal, and concrete crushing.

The Cinema is open.

  • There are two police details on site between 7a – 3p Monday – Friday. They are stationed on Binney and Cardinal Medeiros and are tasked with assisting pedestrians cross the streets safely.
  • Wayfinding for cinema and day care is installed. The plaza is closed to all pedestrians. All patrons of the cinema and daycare need to enter through the main garage entrance and follow signage and striping.

The following activity involves the use of heavy construction and trucking equipment and will create noise.

  • Trucking for delivery of materials to the site
  • Trucking for removal of materials from the site
  • Mechanical, Electrical and Plumbing installations inside and on the roof of the building
  • Exterior façade installation including lifts (inside the construction fence)
  • Permanent roofing work
  • Interior fit out work
  • Work on the plaza between the building and the garage will commence
  • Garage scrim installation
  • Garage stair tower painting 


Construction Update 10/25/18

Neighbors,

Below please find an update of the activity at the 399 Binney Street construction site anticipated for next week. Please reach out to a project team member directly with specific concerns. We will work with you to address specific issues. Working hours are Monday through Friday 7a - 6p (note a variance has been granted for material deliveries until 8p) and Saturday 9a-6p.  Please do not hesitate reaching out to any member of the team with any questions, concerns or comments.

Please join us for a community meeting regarding our revised site plan for 325 Binney Street (former Metropolitan Pipe site) on Monday Oct 29th from 7-8p in the atrium of One Kendall Square. Everyone is invited. See the attached flyer for more information.

The 399 Binney Street site will be open on Saturday 10/27/18 with work beginning at 9a.

Binney Street is scheduled to be closed Saturday 10/27 for crane set up, however if weather prohibits safe work conditions the street closure will be delayed until next Saturday 10/3/18

Work continues with the City of Cambridge and Divco West replacing a drain line and water line in Binney Street from Cardinal Medeiros to the railroad tracks. If you have any questions about the work within the street over the next few weeks, please refer to the DPW project website (below) with questions. Note that all of the projects are working together to find the best options for ensuing pedestrian safety in this busy area.

 

https://www.cambridgema.gov/theworks/cityprojects/detail.aspxpath=%2fsitecore%2fcontent%2fhome%2ftheworks%2fcityprojects%2f2018%2fbinneyststormwater


Building demolition, site work and exploration of the former Met Pipe site will commence in the coming week and is expected to last 6-8 weeks. This work will take place during normal business hours and noise generating activities will include, but not be limited to, drilling test wells, heavy equipment to demolish the buildings, generators for power, loading materials for offsite removal, and concrete crushing.

The Cinema is open.

  • There are two police details on site between 7a – 3p Monday – Friday. They are stationed on Binney and Cardinal Medeiros and are tasked with assisting pedestrians cross the streets safely.
  • Wayfinding for cinema and day care is installed. The plaza is closed to all pedestrians. All patrons of the cinema and daycare need to enter through the main garage entrance and follow signage and striping.

The following activity involves the use of heavy construction and trucking equipment and will create noise.

  • Trucking for delivery of materials to the site
  • Trucking for removal of materials from the site
  • Mechanical, Electrical and Plumbing installations inside and on the roof of the building
  • Exterior façade installation including lifts (inside the construction fence)
  • Permanent roofing work
  • Interior fit out work
  • Work on the plaza between the building and the garage will commence
  • Garage scrim installation
  • Garage stair tower painting 


Construction Update 10/18/18

Neighbors,

Below please find an update of the activity at the 399 Binney Street construction site anticipated for next week. Please reach out to a project team member directly with specific concerns. We will work with you to address specific issues. Working hours are Monday through Friday 7a - 6p (note a variance has been granted for material deliveries until 8p) and Saturday 9a-6p.  Please do not hesitate reaching out to any member of the team with any questions, concerns or comments.

The 399 Binney Street site will be open on Saturday 10/20/18 with work beginning at 9a.

Binney Street will be closed on Friday 10/26/18 for a crane set up.

Work continues with the City of Cambridge and Divco West replacing a drain line and water line in Binney Street from Cardinal Medeiros to the railroad tracks. If you have any questions about the work within the street over the next few weeks, please refer to the DPW project website (below) with questions. Note that all of the projects are working together to find the best options for ensuing pedestrian safety in this busy area.

 

https://www.cambridgema.gov/theworks/cityprojects/detail.aspxpath=%2fsitecore%2fcontent%2fhome%2ftheworks%2fcityprojects%2f2018%2fbinneyststormwater


Building demolition, site work and exploration of the former Met Pipe site will commence in the coming week and is expected to last 6-8 weeks. This work will take place during normal business hours and noise generating activities will include, but not be limited to, drilling test wells, heavy equipment to demolish the buildings, generators for power, loading materials for offsite removal, and concrete crushing.

The Cinema is open.

  • There are two police details on site between 7a – 3p Monday – Friday. They are stationed on Binney and Cardinal Medeiros and are tasked with assisting pedestrians cross the streets safely.
  • Wayfinding for cinema and day care is installed. The plaza is closed to all pedestrians. All patrons of the cinema and daycare need to enter through the main garage entrance and follow signage and striping.

The following activity involves the use of heavy construction and trucking equipment and will create noise.

  • Trucking for delivery of materials to the site
  • Trucking for removal of materials from the site
  • Mechanical, Electrical and Plumbing installations inside and on the roof of the building
  • Exterior façade installation including lifts (inside the construction fence)
  • Permanent roofing work
  • Interior fit out work
  • Work on the plaza between the building and the garage will commence
  • Garage scrim installation
  • Garage stair tower painting 


Construction Update 10/11/18

Neighbors,

Below please find an update of the activity at the 399 Binney Street construction site anticipated for next week. Please reach out to a project team member directly with specific concerns. We will work with you to address specific issues. Working hours are Monday through Friday 7a - 6p (note a variance has been granted for material deliveries until 8p) and Saturday 9a-6p.  Please do not hesitate reaching out to any member of the team with any questions, concerns or comments.

The 399 Binney Street site will be open on Saturday 10/13/18 with work beginning at 9a.

Work continues with the City of Cambridge and Divco West replacing a drain line and water line in Binney Street from Cardinal Medeiros to the railroad tracks. If you have any questions about the work within the street over the next few weeks, please refer to the DPW project website (below) with questions. Note that all of the projects are working together to find the best options for ensuing pedestrian safety in this busy area.

 

https://www.cambridgema.gov/theworks/cityprojects/detail.aspxpath=%2fsitecore%2fcontent%2fhome%2ftheworks%2fcityprojects%2f2018%2fbinneyststormwater


Building demolition, site work and exploration of the former Met Pipe site will commence in the coming week and is expected to last 6-8 weeks. This work will take place during normal business hours and noise generating activities will include, but not be limited to, drilling test wells, heavy equipment to demolish the buildings, generators for power, loading materials for offsite removal, and concrete crushing.

The Cinema is open.

  • There are two police details on site between 7a – 3p Monday – Friday. They are stationed on Binney and Cardinal Medeiros and are tasked with assisting pedestrians cross the streets safely.
  • Wayfinding for cinema and day care is installed. The plaza is closed to all pedestrians. All patrons of the cinema and daycare need to enter through the main garage entrance and follow signage and striping.

The following activity involves the use of heavy construction and trucking equipment and will create noise.

  • Trucking for delivery of materials to the site
  • Trucking for removal of materials from the site
  • Mechanical, Electrical and Plumbing installations inside and on the roof of the building
  • Exterior façade installation including lifts (inside the construction fence)
  • Permanent roofing work
  • Interior fit out work
  • Work on the plaza between the building and the garage will commence
  • Garage scrim installation
  • Garage stair tower painting 


Construction Update 10/4/18

Neighbors,

Below please find an update of the activity at the 399 Binney Street construction site anticipated for next week. Please reach out to a project team member directly with specific concerns. We will work with you to address specific issues. Working hours are Monday through Friday 7a - 6p (note a variance has been granted for material deliveries until 8p) and Saturday 9a-6p.  Please do not hesitate reaching out to any member of the team with any questions, concerns or comments.

The 399 Binney Street site will be open on Saturday 10/6/18 with work beginning at 9a.

The 399 Binney Street site will be closed on Monday 10/8/18.

Binney Street will be closed on Saturday 10/6/18 to allow for a crane setup.

Work continues with the City of Cambridge and Divco West replacing a drain line and water line in Binney Street from Cardinal Medeiros to the railroad tracks. If you have any questions about the work within the street over the next few weeks, please refer to the DPW project website (below) with questions.

 

https://www.cambridgema.gov/theworks/cityprojects/detail.aspxpath=%2fsitecore%2fcontent%2fhome%2ftheworks%2fcityprojects%2f2018%2fbinneyststormwater


We will be hosting a community meeting about our plans for the Met Pipe site Tonight, Thursday Oct 4th 7p in the atrium of 600/700 One Kendall Square. Please join us and invite all neighbors (see attached flyer).

Building demolition, site work and exploration of the former Met Pipe site will commence in the coming week and is expected to last 6-8 weeks. This work will take place during normal business hours and noise generating activities will include, but not be limited to, drilling test wells, heavy equipment to demolish the buildings, generators for power, loading materials for offsite removal, and concrete crushing.

The Cinema is open.

  • There are two police details on site between 7a – 3p Monday – Friday. They are stationed on Binney and Cardinal Medeiros and are tasked with assisting pedestrians cross the streets safely.
  • Wayfinding for cinema and day care is installed. The plaza is closed to all pedestrians. All patrons of the cinema and daycare need to enter through the main garage entrance and follow signage and striping.

The following activity involves the use of heavy construction and trucking equipment and will create noise.

  • Trucking for delivery of materials to the site
  • Trucking for removal of materials from the site
  • Mechanical, Electrical and Plumbing installations inside and on the roof of the building
  • Exterior façade installation including lifts (inside the construction fence)
  • Permanent roofing work
  • Interior fit out work
  • Work on the plaza between the building and the garage will commence
  • Garage scrim installation

Garage stair tower painting 

Construction Update 9/28/18

Neighbors,

Below please find an update of the activity at the 399 Binney Street construction site anticipated for next week. Please reach out to a project team member directly with specific concerns. We will work with you to address specific issues. Working hours are Monday through Friday 7a - 6p (note a variance has been granted for material deliveries until 8p) and Saturday 9a-6p.  Please do not hesitate reaching out to any member of the team with any questions, concerns or comments.

The 399 Binney Street site will be open on Saturday 9/29/18 with work beginning at 9a.

Binney Street will be closed on Saturday 9/29/18 to allow for a crane setup and underground civil work.

Work continues with the City of Cambridge and Divco West replacing a drain line and water line in Binney Street from Cardinal Medeiros to the railroad tracks. If you have any questions about the work within the street over the next few weeks, please refer to the DPW project website (below) with questions.

 

https://www.cambridgema.gov/theworks/cityprojects/detail.aspxpath=%2fsitecore%2fcontent%2fhome%2ftheworks%2fcityprojects%2f2018%2fbinneyststormwater


We will be hosting a community meeting about our plans for the Met Pipe site on Thursday Oct 4th 7p in the atrium of 600/700 One Kendall Square. Please join us and invite all neighbors.

Building demolition, site work and exploration of the former Met Pipe site will commence in the coming week and is expected to last 6-8 weeks. This work will take place during normal business hours and noise generating activities will include, but not be limited to, drilling test wells, heavy equipment to demolish the buildings, generators for power, loading materials for offsite removal, and concrete crushing.

The Cinema is open.

  • There are two police details on site between 7a – 3p Monday – Friday. They are stationed on Binney and Cardinal Medeiros and are tasked with assisting pedestrians cross the streets safely.
  • Wayfinding for cinema and day care is installed. The plaza is closed to all pedestrians. All patrons of the cinema and daycare need to enter through the main garage entrance and follow signage and striping.

The following activity involves the use of heavy construction and trucking equipment and will create noise.

  • Trucking for delivery of materials to the site
  • Trucking for removal of materials from the site
  • Mechanical, Electrical and Plumbing installations inside and on the roof of the building
  • Exterior façade installation including lifts (inside the construction fence)
  • Permanent roofing work
  • Interior fit out work beginning
  • Work on the plaza between the building and the garage will commence
  • Garage scrim installation
  • Garage stair tower painting 


Construction Update 9/20/18

Neighbors,

Below please find an update of the activity at the 399 Binney Street construction site anticipated for next week. Please reach out to a project team member directly with specific concerns. We will work with you to address specific issues. Working hours are Monday through Friday 7a - 6p and Saturday 9a-6p.  Please do not hesitate reaching out to any member of the team with any questions, concerns or comments.

The 399 Binney Street site will be open on Saturday 9/22/18 with work beginning at 9a.

A mechanical equipment upgrade project at Buildings 600 & 700 One Kendall Square may necessitate a large crane to hoist equipment to the roof and subsequent Cardinal Medeiros road closures. During closures a police detail at Cambridge Street will direct local traffic while preventing large trucks from the route. We are working with a number of City departments to ensure this project goes as smoothly and as quickly as possible.

Work continues with the City of Cambridge and Divco West replacing a drain line and water line in Binney Street from Cardinal Medeiros to the railroad tracks. If you have any questions about the work within the street over the next few weeks, please refer to the DPW project website (below) with questions.

 

https://www.cambridgema.gov/theworks/cityprojects/detail.aspxpath=%2fsitecore%2fcontent%2fhome%2ftheworks%2fcityprojects%2f2018%2fbinneyststormwater


EverSource Gas work continues at the corner of Cardinal Mederios and Binney Street both inside and outside the 399 Binney Street project fence for repair work. This work will result in Binney St being closed until further notice. Please contact Kate Riley, Project Administrator, Community Relations, at 617.349.4870 kriley@cambridgema.gov or James Wilcox, Director of Engineering Services at 617-349-6426 with any questions.


We will be hosting a community meeting about our plans for the Met Pipe site on Thursday Oct 4th 7p in the atrium of 600/700 One Kendall Square. Please join us and invite all neighbors. A formal invitation will be going out early next week (see attached flyer).

Building demolition, site work and exploration of the former Met Pipe site will commence in the coming week and is expected to last 6-8 weeks. This work will take place during normal business hours and noise generating activities will include, but not be limited to, drilling test wells, heavy equipment to demolish the buildings, generators for power, loading materials for offsite removal, and concrete crushing.

The Cinema is open.

  • There are two police details on site between 7a – 3p Monday – Friday. They are stationed on Binney and Cardinal Medeiros and are tasked with assisting pedestrians cross the streets safely.
  • Wayfinding for cinema and day care is installed. The plaza is closed to all pedestrians. All patrons of the cinema and daycare need to enter through the main garage entrance and follow signage and striping.

The following activity involves the use of heavy construction and trucking equipment and will create noise.

  • Trucking for delivery of materials to the site
  • Trucking for removal of materials from the site
  • Mechanical, Electrical and Plumbing installations inside and on the roof of the building
  • Exterior façade installation including lifts (inside the construction fence)
  • Permanent roofing work
  • Interior fit out work beginning
  • Work on the plaza between the building and the garage will commence
  • Garage scrim installation
  • Garage stair tower painting 


Construction Update 9/13/18

Neighbors,

Below please find an update of the activity at the 399 Binney Street construction site anticipated for next week. Please reach out to a project team member directly with specific concerns. We will work with you to address specific issues. Working hours are Monday through Friday 7a - 6p and Saturday 9a-6p.  Please do not hesitate reaching out to any member of the team with any questions, concerns or comments.

The 399 Binney Street site will be open on Saturday 9/15/18 with work beginning at 9a.

A mechanical equipment upgrade project at Buildings 600 & 700 One Kendall Square will necessitate a large crane to hoist equipment to the roof and subsequent Cardinal Medeiros road closure on Saturday September 15th. During the closure a police detail at Cambridge Street will direct local traffic while preventing large trucks from the route. The project will begin at 7a. We are working with a number of City departments to ensure this project goes as smoothly and as quickly as possible.

Work continues with the City of Cambridge and Divco West replacing a drain line and water line in Binney Street from Cardinal Medeiros to the railroad tracks. If you have any questions about the work within the street over the next few weeks, please refer to the DPW project website (below) with questions.

 

https://www.cambridgema.gov/theworks/cityprojects/detail.aspxpath=%2fsitecore%2fcontent%2fhome%2ftheworks%2fcityprojects%2f2018%2fbinneyststormwater


EverSource Gas work continues at the corner of Cardinal Mederios and Binney Street both inside and outside the 399 Binney Street project fence for repair work. This work will result in Binney St being closed until further notice. Please contact Kate Riley, Project Administrator, Community Relations, at 617.349.4870 kriley@cambridgema.gov or James Wilcox, Director of Engineering Services at 617-349-6426 with any questions.


We will be hosting a community meeting about our plans for the Met Pipe site on Thursday Oct 4th 7p in the atrium of 600/700 One Kendall Square. Please join us and invite all neighbors. A formal invitation will be going out early next week.

Building demolition, site work and exploration of the former Met Pipe site will commence in the coming week and is expected to last 6-8 weeks. This work will take place during normal business hours and noise generating activities will include, but not be limited to, drilling test wells, heavy equipment to demolish the buildings, generators for power, loading materials for offsite removal, and concrete crushing.

The Cinema is open.

  • There are two police details on site between 7a – 3p Monday – Friday. They are stationed on Binney and Cardinal Medeiros and are tasked with assisting pedestrians cross the streets safely.
  • Wayfinding for cinema and day care is installed. The plaza is closed to all pedestrians. All patrons of the cinema and daycare need to enter through the main garage entrance and follow signage and striping.

The following activity involves the use of heavy construction and trucking equipment and will create noise.

  • Trucking for delivery of materials to the site
  • Trucking for removal of materials from the site
  • Mechanical, Electrical and Plumbing installations inside and on the roof of the building
  • Exterior façade installation including lifts (inside the construction fence)
  • Permanent roofing work
  • Interior fit out work beginning
  • Work on the plaza between the building and the garage will commence
  • Garage scrim installation
  • Garage stair tower painting 

Construction Update 9/7/18

Neighbors,

Below please find an update of the activity at the 399 Binney Street construction site anticipated for next week. Please reach out to a project team member directly with specific concerns. We will work with you to address specific issues. Working hours are Monday through Friday 7a - 6p and Saturday 9a-6p.  Please do not hesitate reaching out to any member of the team with any questions, concerns or comments.

The 399 Binney Street site will be open on Saturday 9/15/18 with work beginning at 9a.

A mechanical equipment upgrade project at Buildings 600 & 700 One Kendall Square will necessitate a large crane to hoist equipment to the roof and subsequent Cardinal Medeiros road closure on Saturday September 15th. During the closure a police detail at Cambridge Street will direct local traffic while preventing large trucks from the route. The project will begin at 7a. We are working with a number of City departments to ensure this project goes as smoothly and as quickly as possible.

Work continues with the City of Cambridge and Divco West replacing a drain line and water line in Binney Street from Cardinal Medeiros to the railroad tracks. If you have any questions about the work within the street over the next few weeks, please refer to the DPW project website (below) with questions.

 

https://www.cambridgema.gov/theworks/cityprojects/detail.aspxpath=%2fsitecore%2fcontent%2fhome%2ftheworks%2fcityprojects%2f2018%2fbinneyststormwater


EverSource Gas work continues at the corner of Cardinal Mederios and Binney Street both inside and outside the 399 Binney Street project fence for repair work. This work will result in Binney St being closed until further notice. Please contact Kate Riley, Project Administrator, Community Relations, at 617.349.4870 kriley@cambridgema.gov or James Wilcox, Director of Engineering Services at 617-349-6426 with any questions.


Building demolition, site work and exploration of the former Met Pipe site will commence in the coming week and is expected to last 6-8 weeks. This work will take place during normal business hours and noise generating activities will include, but not be limited to, drilling test wells, heavy equipment to demolish the buildings, generators for power, loading materials for offsite removal, and concrete crushing.

The Cinema is open.

  • There are two police details on site between 7a – 3p Monday – Friday. They are stationed on Binney and Cardinal Medeiros and are tasked with assisting pedestrians cross the streets safely.
  • Wayfinding for cinema and day care is installed. The plaza is closed to all pedestrians. All patrons of the cinema and daycare need to enter through the main garage entrance and follow signage and striping.

The following activity involves the use of heavy construction and trucking equipment and will create noise.

  • Trucking for delivery of materials to the site
  • Trucking for removal of materials from the site
  • Mechanical, Electrical and Plumbing installations inside and on the roof of the building
  • Exterior façade installation 
  • Permanent roofing work
  • Interior fit out work beginning
  • Work on the plaza between the building and the garage will commence


Construction Update 8/30/18

Neighbors,

Below please find an update of the activity at the 399 Binney Street construction site anticipated for next week. Please reach out to a project team member directly with specific concerns. We will work with you to address specific issues. Working hours are Monday through Friday 7a - 6p and Saturday 9a-6p.  Please do not hesitate reaching out to any member of the team with any questions, concerns or comments.

The 399 Binney Street site will be open on Saturday 9/8/18 with work beginning at 9a.

The 399 Binney Street site will be closed on Labor day Monday 9/3/18.

A mechanical equipment upgrade project at Buildings 600 & 700 One Kendall Square will necessitate a large crane to hoist equipment to the roof and subsequent Cardinal Medeiros road closure on Saturday September 8th. During the closure a police detail at Cambridge Street will direct local traffic while preventing large trucks from the route. The project will begin at 7a. We are working with a number of City departments to ensure this project goes as smoothly and as quickly as possible.

Work continues with the City of Cambridge and Divco West replacing a drain line and water line in Binney Street from Cardinal Medeiros to the railroad tracks. If you have any questions about the work within the street over the next few weeks, please refer to the DPW project website (below) with questions.

 

https://www.cambridgema.gov/theworks/cityprojects/detail.aspxpath=%2fsitecore%2fcontent%2fhome%2ftheworks%2fcityprojects%2f2018%2fbinneyststormwater


EverSource Gas work continues at the corner of Cardinal Mederios and Binney Street both inside and outside the 399 Binney Street project fence for repair work. This work will result in Binney St being closed until 9/14/18. Please contact Kate Riley, Project Administrator, Community Relations, at 617.349.4870 /kriley@cambridgema.gov or James Wilcox, Director of Engineering Services at 617-349-6426 with any questions.


Building demolition of the former Met Pipe buildings and associated site work will commence in the coming week and is expected to last 6-8 weeks. This work will take place during normal business hours and will include noise generating activities including, but not limited to, using heavy equipment to demolish the buildings, loading materials for offsite removal, concrete crushing, and drilling test wells.

The Cinema is open.

  • There are two police details on site between 7a – 3p Monday – Friday. They are stationed on Binney and Cardinal Medeiros and are tasked with assisting pedestrians cross the streets safely.
  • Binney Street is open as a one-way “Share the Road” (bicycles & vehicles) lane going eastbound.
  • Wayfinding for cinema and day care is installed. The plaza is closed to all pedestrians. All patrons of the cinema and daycare need to enter through the main garage entrance and follow signage and striping.

The following activity involves the use of heavy construction and trucking equipment and will create noise.

  • Trucking for delivery of materials to the site
  • Trucking for removal of materials from the site
  • Mechanical, Electrical and Plumbing installations inside and on the roof of the building
  • Exterior façade installation 
  • Permanent roofing work
  • Interior fit out work beginning
  • Work on the plaza between the building and the garage will commence


Construction Update 8/24/18

Neighbors,

Below please find an update of the activity at the 399 Binney Street construction site anticipated for next week. Please reach out to a project team member directly with specific concerns. We will work with you to address specific issues. Working hours are Monday through Friday 7a - 6p and Saturday 9a-6p.  Please do not hesitate reaching out to any member of the team with any questions, concerns or comments.

The 399 Binney Street site will be open on Saturday 8/25/18 with work beginning at 9a.

A mechanical equipment upgrade project at Buildings 600 & 700 One Kendall Square will necessitate a large crane to hoist equipment to the roof and subsequent Cardinal Medeiros road closure on Saturday August 25th. During the closure a police detail at Cambridge Street will direct local traffic while preventing large trucks from the route. The project will begin at 7a. We are working with a number of City departments to ensure this project goes as smoothly and as quickly as possible.

Work continues with the City of Cambridge and Divco West replacing a drain line and water line in Binney Street from Cardinal Medeiros to the railroad tracks. If you have any questions about the work within the street over the next few weeks, please refer to the DPW project website (below) with questions.

 

https://www.cambridgema.gov/theworks/cityprojects/detail.aspxpath=%2fsitecore%2fcontent%2fhome%2ftheworks%2fcityprojects%2f2018%2fbinneyststormwater


EverSource Gas work continues at the corner of Cardinal Mederios and Binney Street both inside and outside the 399 Binney Street project fence for repair work. This work may result in overnight Binney St road closures.

Building demolition of the former Met Pipe buildings and associated site work commences next week and is expected to last 6-8 weeks. This work will take place during normal business hours and will include noise generating activities including, but not limited to, using heavy equipment to demolish the buildings, loading materials for offsite removal, concrete crushing, and drilling test wells.

The Cinema is open.

  • There are two police details on site between 7a – 3p Monday – Friday. They are stationed on Binney and Cardinal Medeiros and are tasked with assisting pedestrians cross the streets safely.
  • Binney Street is open as a one-way “Share the Road” (bicycles & vehicles) lane going eastbound.
  • Wayfinding for cinema and day care is installed. The plaza is closed to all pedestrians. All patrons of the cinema and daycare need to enter through the main garage entrance and follow signage and striping.

The following activity involves the use of heavy construction and trucking equipment and will create noise.

  • Trucking for delivery of materials to the site
  • Trucking for removal of materials from the site
  • Mechanical, Electrical and Plumbing installations inside and on the roof of the building
  • Exterior façade installation 
  • Permanent roofing work
  • Interior fit out work beginning


Construction Update 8/17/2018

Neighbors,

Below please find an update of the activity at the 399 Binney Street construction site anticipated for next week. Please reach out to a project team member directly with specific concerns. We will work with you to address specific issues. Working hours are Monday through Friday 7a - 6p and Saturday 9a-6p.  Please do not hesitate reaching out to any member of the team with any questions, concerns or comments.

The 399 Binney Street site will be open on Saturday 8/18/18 with work beginning at 9a.

A mechanical equipment upgrade project at Buildings 600 & 700 One Kendall Square will necessitate a large crane to hoist equipment to the roof and subsequent Cardinal Medeiros road closure on Saturday August 18th. During the closure a police detail at Cambridge Street will direct local traffic while preventing large trucks from the route. The project will begin at 7a. We are working with a number of City departments to ensure this project goes as smoothly and as quickly as possible.

Work continues with the City of Cambridge and Divco West replacing a drain line and water line in Binney Street from Cardinal Medeiros to the railroad tracks. If you have any questions about the work within the street over the next few weeks, please refer to the DPW project website (below) with questions.

 

https://www.cambridgema.gov/theworks/cityprojects/detail.aspx?path=%2fsitecore%2fcontent%2fhome%2ftheworks%2fcityprojects%2f2018%2fbinneyststormwater


EverSource Gas will again be mobilizing at the corner of Cardinal Mederios and Binney Street both inside and outside the 399 Binney Street project fence for repair work. This work may result in overnight Binney St road closures.

Building demolition of the former Met Pipe buildings and associated site work commences next week and is expected to last 6-8 weeks. This work will take place during normal business hours and will include noise generating activities including, but not limited to, using heavy equipment to demolish the buildings, loading materials for offsite removal, concrete crushing, and drilling test wells.

The Cinema is open.

  • There are two police details on site between 7a – 3p Monday – Friday. They are stationed on Binney and Cardinal Medeiros and are tasked with assisting pedestrians cross the streets safely.
  • Binney Street is open as a one-way “Share the Road” (bicycles & vehicles) lane going eastbound.
  • Wayfinding for cinema and day care is installed. The plaza is closed to all pedestrians. All patrons of the cinema and daycare need to enter through the main garage entrance and follow signage and striping.

The following activity involves the use of heavy construction and trucking equipment and will create noise.

  • Trucking for delivery of materials to the site
  • Trucking for removal of materials from the site
  • Mechanical, Electrical and Plumbing installations inside and on the roof of the building
  • Exterior façade installation 
  • Permanent roofing work
  • Interior fit out work beginning
  • Eversource will be installing a ductbank on the site


Construction Update 08/10/18

Neighbors,

Below please find an update of the activity at the 399 Binney Street construction site anticipated for next week. Please reach out to a project team member directly with specific concerns. We will work with you to address specific issues. Working hours are Monday through Friday 7a - 6p and Saturday 9a-6p.  Please do not hesitate reaching out to any member of the team with any questions, concerns or comments.

The 399 Binney Street site will be open on Saturday 8/11/18 with work beginning at 9a.

A mechanical equipment upgrade project at Buildings 600 & 700 One Kendall Square will necessitate a large crane to hoist equipment to the roof and subsequent Cardinal Medeiros road closure on Saturday August 11th. During the closure a police detail at Cambridge Street will direct local traffic while preventing large trucks from the route. The project will begin at 7a. We are working with a number of City departments to ensure this project goes as smoothly and as quickly as possible.

Over the next few weeks, the City of Cambridge and Divco West will be replacing a drain line and water line in Binney Street from Cardinal Medeiros to the railroad tracks. If you have any questions about the work within the street over the next few weeks, please refer to the DPW project website (below) with questions.

 

https://www.cambridgema.gov/theworks/cityprojects/detail.aspxpath=%2fsitecore%2fcontent%2fhome%2ftheworks%2fcityprojects%2f2018%2fbinneyststormwater


EverSource Gas will be mobilizing at the corner of Cardinal Mederios and Binney Street both inside and outside the 399 Binney Street project fence for repair work.

Building demolition of the former Met Pipe buildings and associated site work commences next week and is expected to last 6-8 weeks. This work will take place during normal business hours and will include noise generating activities including, but not limited to, using heavy equipment to demolish the buildings, loading materials for offsite removal, concrete crushing, and drilling test wells.

The Cinema is open.

  • There are two police details on site between 7a – 3p Monday – Friday. They are stationed on Binney and Cardinal Medeiros and are tasked with assisting pedestrians cross the streets safely.
  • Binney Street is open as a one-way “Share the Road” (bicycles & vehicles) lane going eastbound.
  • Wayfinding for cinema and day care is installed. The plaza is closed to all pedestrians. All patrons of the cinema and daycare need to enter through the main garage entrance and follow signage and striping.

The following activity involves the use of heavy construction and trucking equipment and will create noise.

  • Trucking for delivery of materials to the site
  • Trucking for removal of materials from the site
  • Mechanical, Electrical and Plumbing installations inside and on the roof of the building
  • Exterior façade installation 
  • Permanent roofing work
  • Interior fit out work beginning
  • Eversource will be installing a ductbank on the site


Weekly Construction Update 8/3/18

Neighbors,

Below please find an update of the activity at the 399 Binney Street construction site anticipated for next week. Please reach out to a project team member directly with specific concerns. We will work with you to address specific issues. Working hours are Monday through Friday 7a - 6p and Saturday 9a-6p.  Please do not hesitate reaching out to any member of the team with any questions, concerns or comments.

The 399 Binney Street site will be open on Saturday 8/4/18 with work beginning at 9a.

Over the next few weeks, the City of Cambridge and Divco West will be replacing a drain line and water line in Binney Street from Cardinal Medeiros to the railroad tracks. If you have any questions about the work within the street over the next few weeks, please refer to the DPW project website (below) with questions.

 

https://www.cambridgema.gov/theworks/cityprojects/detail.aspxpath=%2fsitecore%2fcontent%2fhome%2ftheworks%2fcityprojects%2f2018%2fbinneyststormwater


EverSource Gas will be mobilizing at the corner of Cardinal Mederios and Binney Street both inside and outside the 399 Binney Street project fence for repair work beginning on 8/6/18.


The Cinema is open.

  • There are two police details on site between 7a – 3p Monday – Friday. They are stationed on Binney and Cardinal Medeiros and are tasked with assisting pedestrians cross the streets safely.
  • Binney Street is open as a one-way “Share the Road” (bicycles & vehicles) lane going eastbound.
  • Wayfinding for cinema and day care is installed. The plaza is closed to all pedestrians. All patrons of the cinema and daycare need to enter through the main garage entrance and follow signage and striping.

The following activity involves the use of heavy construction and trucking equipment and will create noise.

  • Trucking for delivery of materials to the site
  • Trucking for removal of materials from the site
  • Mechanical, Electrical and Plumbing installations inside and on the roof of the building
  • Exterior façade installation 
  • Permanent roofing work getting underway
  • Interior fit out work beginning
  • Eversource will be installing a ductbank on the site


Construction Update 7/27/18

Neighbors,

Below please find an update of the activity at the 399 Binney Street construction site anticipated for next week. Please reach out to a project team member directly with specific concerns. We will work with you to address specific issues. Working hours are Monday through Friday 7a - 6p and Saturday 9a-6p.  Please do not hesitate reaching out to any member of the team with any questions, concerns or comments.

The 399 Binney Street site will be open on Saturday 7/28/18 with work beginning at 9a.

Over the next few weeks, the City of Cambridge and Divco West will be replacing a drain line and water line in Binney Street from Cardinal Medeiros to the railroad tracks. If you have any questions about the work within the street over the next few weeks, please refer to the DPW project website (below) with questions.

 

https://www.cambridgema.gov/theworks/cityprojects/detail.aspxpath=%2fsitecore%2fcontent%2fhome%2ftheworks%2fcityprojects%2f2018%2fbinneyststormwater


A mechanical equipment upgrade project at Buildings 600 & 700 One Kendall Square will necessitate a large crane to hoist equipment to the roof and subsequent Cardinal Medeiros road closure on Saturday July 28th. During the closure a police detail at Cambridge Street will direct local traffic while preventing large trucks from the route. The project will begin at 7a. We are working with a number of City departments to ensure this project goes as smoothly and as quickly as possible.

The Cinema is open.

  • There are two police details on site between 7a – 3p Monday – Friday. They are stationed on Binney and Cardinal Medeiros and are tasked with assisting pedestrians cross the streets safely.
  • Binney Street is open as a one-way “Share the Road” (bicycles & vehicles) lane going eastbound.
  • Wayfinding for cinema and day care is installed. The plaza is closed to all pedestrians. All patrons of the cinema and daycare need to enter through the main garage entrance and follow signage and striping.

The following activity involves the use of heavy construction and trucking equipment and will create noise.

  • Trucking for delivery of materials to the site
  • Concrete placement inside the site.
  • Trucking for removal of materials from the site
  • Mechanical, Electrical and Plumbing installations inside and on the roof of the building
  • Exterior façade installation 
  • Permanent roofing work getting underway
  • Interior fit out work beginning
  • Eversource will be installing a ductbank on the site


DPW Notice - Binney Street closure at Cardinal Medeiros

Neighbors,

Please see attached notice from The Cambridge DPW regarding the upcoming Binney Street closure. Please reach out to the DPW (below contact info) with any questions.

Contact Kate Riley, Project Administrator, Community Relations, at 617.349.4870/ kriley@cambridgema.gov or James Wilcox, Director of Engineering Services at 617-349-6426


Construction Update 7/20/18

Neighbors,

Below please find an update of the activity at the 399 Binney Street construction site anticipated for next week. Please reach out to a project team member directly with specific concerns. We will work with you to address specific issues. Working hours are Monday through Friday 7a - 6p and Saturday 9a-6p.  Please do not hesitate reaching out to any member of the team with any questions, concerns or comments.

The 399 Binney Street site will be open on Saturday 7/21/18 with work beginning at 9a.

Over the next few weeks, the City of Cambridge and Divco West will be replacing a drain line and water line in Binney Street from Cardinal Medeiros to the railroad tracks. If you have any questions about the work within the street over the next three weeks, please refer to the DPW project website (below) with questions.

 

https://www.cambridgema.gov/theworks/cityprojects/detail.aspx?path=%2fsitecore%2fcontent%2fhome%2ftheworks%2fcityprojects%2f2018%2fbinneyststormwater


A mechanical equipment upgrade project at Buildings 600 & 700 One Kendall Square will necessitate a large crane to hoist equipment to the roof and subsequent Cardinal Medeiros road closure on Saturday July 21st and Sunday July 22nd. During the closure a police detail at Cambridge Street will direct local traffic while preventing large trucks from the route. The project will begin at 7a. We are working with a number of City departments to ensure this project goes as smoothly and as quickly as possible.

The Cinema is open.

  • There are two police details on site between 7a – 3p Monday – Friday. They are stationed on Binney and Cardinal Medeiros and are tasked with assisting pedestrians cross the streets safely.
  • Binney Street is open as a one-way “Share the Road” (bicycles & vehicles) lane going eastbound.
  • Wayfinding for cinema and day care is installed. The plaza is closed to all pedestrians. All patrons of the cinema and daycare need to enter through the main garage entrance and follow signage and striping.

The following activity involves the use of heavy construction and trucking equipment and will create noise.

  • Trucking for delivery of materials to the site
  • Concrete placement inside the site.
  • Trucking for removal of materials from the site
  • Mechanical, Electrical and Plumbing installations inside and on the roof of the building
  • Exterior façade installation 
  • Permanent roofing work getting underway
  • Interior fit out work beginning


Construction Update 7/13/18

Neighbors,

Below please find an update of the activity at the 399 Binney Street construction site anticipated for next week. Please reach out to a project team member directly with specific concerns. We will work with you to address specific issues. Working hours are Monday through Friday 7a - 6p and Saturday 9a-6p.  Please do not hesitate reaching out to any member of the team with any questions, concerns or comments.

The 399 Binney Street site will be open on Saturday 7/14/18 with work beginning at 9a.

Over the next three weeks, the City of Cambridge and Divco West will be replacing a drain line and water line in Binney Street from Cardinal Medeiros to the railroad tracks. If you have any questions about the work within the street over the next three weeks, please refer to the DPW project website (below) with questions.

https://www.cambridgema.gov/theworks/cityprojects/detail.aspxpath=%2fsitecore%2fcontent%2fhome%2ftheworks%2fcityprojects%2f2018%2fbinneyststormwater


A mechanical equipment upgrade project at Buildings 600 & 700 One Kendall Square will necessitate a large crane to hoist equipment to the roof and subsequent Cardinal Medeiros road closure on Saturday June 30th and Sunday July 1st. Please note that a similar road closure is also expected for Saturday July 14th and Sunday July 15th. During the closure a police detail at Cambridge Street will direct local traffic while preventing large trucks from the route. The project will begin at 7a. We are working with a number of City departments to ensure this project goes as smoothly and as quickly as possible.

The Cinema is open.

  • There are two police details on site between 7a – 3p Monday – Friday. They are stationed on Binney and Cardinal Medeiros and are tasked with assisting pedestrians cross the streets safely.
  • Binney Street is open as a one-way “Share the Road” (bicycles & vehicles) lane going eastbound.
  • Wayfinding for cinema and day care is installed. The plaza is closed to all pedestrians. All patrons of the cinema and daycare need to enter through the main garage entrance and follow signage and striping.

The following activity involves the use of heavy construction and trucking equipment and will create noise.

  • Trucking for delivery of materials to the site
  • Concrete placement inside the site.
  • Trucking for removal of materials from the site
  • Mechanical, Electrical and Plumbing installations inside and on the roof of the building
  • Exterior façade installation 


399 Binney Street Weekly Construction Update, 7/6/2018

Neighbors,

Below please find an update of the activity at the 399 Binney Street construction site anticipated for next week. Please reach out to a project team member directly with specific concerns. We will work with you to address specific issues. Working hours are Monday through Friday 7a - 6p and Saturday 9a-6p.  Please do not hesitate reaching out to any member of the team with any questions, concerns or comments.

The 399 Binney Street site will be open on Saturday 7/7/18 with work beginning at 9a.

Binney Street will be closed Saturday 7/7 for a crane pick, reopening following completion of work Saturday evening. 

Concrete placement will occur on Wednesday 7/11/18 inside the site. 

The Cinema is open.

  • There are two police details on site between 7a – 3p Monday – Friday. They are stationed on Binney and Cardinal Medeiros and are tasked with assisting pedestrians cross the streets safely.
  • Binney Street is open as a one-way “Share the Road” (bicycles & vehicles) lane going eastbound.
  • Wayfinding for cinema and day care is installed. The plaza is closed to all pedestrians. All patrons of the cinema and daycare need to enter through the main garage entrance and follow signage and striping.

The following activity involves the use of heavy construction and trucking equipment and will create noise.

  • Trucking for delivery of materials to the site
  • Concrete placement inside the site.
  • Trucking for removal of materials from the site
  • Mechanical, Electrical and Plumbing installations inside and on the roof of the building
  • Exterior façade installation 

Check out the new 399 Binney Street project website (see link / url to copy below). Sign up to receive updates, post comments and questions, see the latest renderings.

 

https://courbanize.com/projects/399binney/information

 

Thanks,

Jamie

Construction Update 7/30/18

Neighbors,

Below please find an update of the activity at the 399 Binney Street construction site anticipated for next week. Please reach out to a project team member directly with specific concerns. We will work with you to address specific issues. Working hours are Monday through Friday 7a - 6p and Saturday 9a-6p.  Please do not hesitate reaching out to any member of the team with any questions, concerns or comments.

The 399 Binney Street site will be open on Saturday 6/30/18 with work beginning at 9a.

The 399 Binney Street site will be closed on Wednesday 7/4/18.

A sample of the garage scrim has been installed on the western side of the garage.

A mechanical equipment upgrade project at Buildings 600 & 700 One Kendall Square will necessitate a large crane to hoist equipment to the roof and subsequent Cardinal Medeiros road closure on Saturday June 30th and Sunday July 1st. Please note that a similar road closure is also expected for Saturday July 7th and Sunday July 8th. During the closure a police detail at Cambridge Street will direct local traffic while preventing large trucks from the route. The project will begin at 7a. We are working with a number of City departments to ensure this project goes as smoothly and as quickly as possible.

The Cinema is open.

  • There are two police details on site between 7a – 3p Monday – Friday. They are stationed on Binney and Cardinal Medeiros and are tasked with assisting pedestrians cross the streets safely.
  • Binney Street is open as a one-way “Share the Road” (bicycles & vehicles) lane going eastbound.
  • Wayfinding for cinema and day care is installed. The plaza is closed to all pedestrians. All patrons of the cinema and daycare need to enter through the main garage entrance and follow signage and striping.

The following activity involves the use of heavy construction and trucking equipment and will create noise.

  • Trucking for delivery of materials to the site
  • Concrete placement inside the site.
  • Trucking for removal of materials from the site
  • Mechanical, Electrical and Plumbing installations inside and on the roof of the building
  • Exterior façade installation 
  • Generator pick necessitating a crane on the Plaza on Saturday 7/7/18.


Construction Update 6/21/18

Neighbors,

Below please find an update of the activity at the 399 Binney Street construction site anticipated for next week. Please reach out to a project team member directly with specific concerns. We will work with you to address specific issues. Working hours are Monday through Friday 7a - 6p and Saturday 9a-6p.  Please do not hesitate reaching out to any member of the team with any questions, concerns or comments.

The 399 Binney Street site will be open on Saturday 6/23/18 and 6/30/18 beginning at 9a.

A mechanical equipment upgrade project at Buildings 600 & 700 One Kendall Square will necessitate a large crane to hoist equipment to the roof and subsequent Cardinal Medeiros road closure on Saturday June 23rd and Sunday June 24th. Please note that a similar road closure is also expected for Saturday July 7th and Sunday July 8th. During the closure a police detail at Cambridge Street will direct local traffic while preventing large trucks from the route. The project will begin at 7a. We are working with a number of City departments to ensure this project goes as smoothly and as quickly as possible.

The Cinema is open.

  • There are two police details on site between 7a – 3p Monday – Friday. They are stationed on Binney and Cardinal Medeiros and are tasked with assisting pedestrians cross the streets safely.
  • Binney Street is open as a one-way “Share the Road” (bicycles & vehicles) lane going eastbound.
  • Wayfinding for cinema and day care is installed. The plaza is closed to all pedestrians. All patrons of the cinema and daycare need to enter through the main garage entrance and follow signage and striping.

The following activity involves the use of heavy construction and trucking equipment and will create noise.

  • Trucking for delivery of materials to the site
  • Trucking for removal of materials from the site
  • Mechanical, Electrical and Plumbing installations inside the building
  • Exterior façade installation 


Construction Update 6/15/18

Neighbors,

Below please find an update of the activity at the 399 Binney Street construction site anticipated for next week. Please reach out to a project team member directly with specific concerns. We will work with you to address specific issues. Working hours are Monday through Friday 7a - 6p and Saturday 9a-6p.  Please do not hesitate reaching out to any member of the team with any questions, concerns or comments.

The site will be open on Saturday 6/16/18 beginning at 7a.

A mechanical equipment upgrade project at Buildings 600 & 700 One Kendall Square will necessitate a large crane to hoist equipment to the roof and subsequent Cardinal Medeiros road closure on Saturday June 16th and Sunday June 17th. During the closure a police detail at Cambridge Street will direct local traffic while preventing large trucks from the route. The project will begin at 7a (vs 9a) to allow it to be completed in one day. We are working with a number of City departments to ensure this project goes as smoothly and as quickly as possible.

The Cinema is open.

  • There are two police details on site between 7a – 3p Monday – Friday. They are stationed on Binney and Cardinal Medeiros and are tasked with assisting pedestrians cross the streets safely.
  • Binney Street is open as a one-way “Share the Road” (bicycles & vehicles) lane going eastbound.
  • Wayfinding for cinema and day care is installed. The plaza is closed to all pedestrians. All patrons of the cinema and daycare need to enter through the main garage entrance and follow signage and striping.

The following activity involves the use of heavy construction and trucking equipment and will create noise.

  • Trucking for delivery of materials to the site
  • Trucking for removal of materials from the site
  • Spray fireproofing continues
  • Exterior façade installation 


Construction Update 6/8/18

Neighbors,

Below please find an update of the activity at the 399 Binney Street construction site anticipated for next week. Please reach out to a project team member directly with specific concerns. We will work with you to address specific issues. Working hours are Monday through Friday 7a - 6p and Saturday 9a-6p.  Please do not hesitate reaching out to any member of the team with any questions, concerns or comments.

The site will be open on Saturday 6/9/18 beginning at 7a.

A mechanical equipment upgrade project at Buildings 600 & 700 One Kendall Square will necessitate a large crane to hoist equipment to the roof and subsequent Cardinal Medeiros road closure on Saturday June 9th and Sunday June 10th. During the closure a police detail at Cambridge Street will direct local traffic while preventing large trucks from the route. The project will begin at 7a (vs 9a) to allow it to be completed in one day. We are working with a number of City departments to ensure this project goes as smoothly and as quickly as possible.

The Cinema is open.

  • There are two police details on site between 7a – 3p Monday – Friday. They are stationed on Binney and Cardinal Medeiros and are tasked with assisting pedestrians cross the streets safely.
  • Binney Street is open as a one-way “Share the Road” (bicycles & vehicles) lane going eastbound.
  • Wayfinding for cinema and day care is installed. The plaza is closed to all pedestrians. All patrons of the cinema and daycare need to enter through the main garage entrance and follow signage and striping.

The following activity involves the use of heavy construction and trucking equipment and will create noise.

  • Trucking for delivery of materials to the site
  • Trucking for removal of materials from the site
  • Spray fireproofing continues
  • Exterior façade installation 


Construction Update 6/4/18

Neighbors,

Below please find an update of the activity at the 399 Binney Street construction site anticipated for next week. Please reach out to a project team member directly with specific concerns. We will work with you to address specific issues. Working hours are Monday through Friday 7a - 6p and Saturday 9a-6p.  Please do not hesitate reaching out to any member of the team with any questions, concerns or comments.

The site will be open on Saturday 6/2/18 beginning at 7a.

A mechanical equipment upgrade project at Buildings 600 & 700 One Kendall Square will necessitate a large crane to hoist equipment to the roof and subsequent Cardinal Medeiros road closure on Saturday June 2nd. During the closure a police detail at Cambridge Street will direct local traffic while preventing large trucks from the route. The project will begin at 7a (vs 9a) to allow it to be completed in one day. We are working with a number of City departments to ensure this project goes as smoothly and as quickly as possible.

The Cinema is open.

  • There are two police details on site between 7a – 3p Monday – Friday. They are stationed on Binney and Cardinal Medeiros and are tasked with assisting pedestrians cross the streets safely.
  • Binney Street is open as a one-way “Share the Road” (bicycles & vehicles) lane going eastbound.
  • Wayfinding for cinema and day care is installed. The plaza is closed to all pedestrians. All patrons of the cinema and daycare need to enter through the main garage entrance and follow signage and striping.

The following activity involves the use of heavy construction and trucking equipment and will create noise.

  • Trucking for delivery of materials to the site
  • Trucking for removal of materials from the site
  • Spray fireproofing continues
  • Exterior façade installation 


Construction Update 5/28/18

Neighbors,

Below please find an update of the activity at the 399 Binney Street construction site anticipated for next week. Please reach out to a project team member directly with specific concerns. We will work with you to address specific issues. Working hours are Monday through Friday 7a - 6p and Saturday 9a-6p.  Please do not hesitate reaching out to any member of the team with any questions, concerns or comments.

The site will potentially be open on Saturday 5/26/18.

The site will be closed on Monday 5/28/18 for Memorial Day.

The Cinema is open.

  • There are two police details on site between 7a – 3p Monday – Friday. They are stationed on Binney and Cardinal Medeiros and are tasked with assisting pedestrians cross the streets safely.
  • Binney Street is open as a one-way “Share the Road” (bicycles & vehicles) lane going eastbound.
  • Wayfinding for cinema and day care is installed. The plaza is closed to all pedestrians. All patrons of the cinema and daycare need to enter through the main garage entrance and follow signage and striping.

The following activity involves the use of heavy construction and trucking equipment and will create noise.

  • Trucking for delivery of materials to the site
  • Trucking for removal of materials from the site
  • Crane setup to support mechanical equipment deliveries
  • Spray fireproofing underway
  • Exterior façade installation 


Construction Update 5/21/18

Neighbors,


Below please find an update of the activity at the 399 Binney Street construction site anticipated for next week. Please reach out to a project team member directly with specific concerns. We will work with you to address specific issues. Working hours are Monday through Friday 7a - 6p and Saturday 9a-6p.  Please do not hesitate reaching out to any member of the team with any questions, concerns or comments.

The site will potentially be open on Saturday 5/19/18.

The Cinema is open.

  • There are two police details on site between 7a – 3p Monday – Friday. They are stationed on Binney and Cardinal Medeiros and are tasked with assisting pedestrians cross the streets safely.
  • Binney Street is open as a one-way “Share the Road” (bicycles & vehicles) lane going eastbound.
  • Wayfinding for cinema and day care is installed. The plaza is closed to all pedestrians. All patrons of the cinema and daycare need to enter through the main garage entrance and follow signage and striping.

The following activity involves the use of heavy construction and trucking equipment and will create noise.

  • Trucking for delivery of materials to the site
  • Trucking for removal of materials from the site
  • Spray fireproofing underway
  • Concrete placement
  • Exterior façade installation
  • Eversource Electric will be working inside the site 


Construction Update 5/14/18

Neighbors,

Below please find an update of the activity at the 399 Binney Street construction site anticipated for next week. Please reach out to a project team member directly with specific concerns. We will work with you to address specific issues. Working hours are Monday through Friday 7a - 6p and Saturday 9a-6p.  Please do not hesitate reaching out to any member of the team with any questions, concerns or comments.

The site will potentially be open on Saturday 5/12/18.

The Cinema is open.

  • There are two police details on site between 7a – 3p Monday – Friday. They are stationed on Binney and Cardinal Medeiros and are tasked with assisting pedestrians cross the streets safely.
  • Binney Street is open as a one-way “Share the Road” (bicycles & vehicles) lane going eastbound.
  • Wayfinding for cinema and day care is installed. The plaza is closed to all pedestrians. All patrons of the cinema and daycare need to enter through the main garage entrance and follow signage and striping.

The following activity involves the use of heavy construction and trucking equipment and will create noise.

  • Trucking for delivery of materials to the site
  • Trucking for removal of materials from the site
  • Spray fireproofing underway
  • Exterior façade installation begins


Construction Update 5/7/18

Neighbors,


Below please find an update of the activity at the 399 Binney Street construction site anticipated for next week. Please reach out to a project team member directly with specific concerns. We will work with you to address specific issues. Working hours are Monday through Friday 7a - 6p and Saturday 9a-6p.  Please do not hesitate reaching out to any member of the team with any questions, concerns or comments.

The site will potentially be open on Saturday 5/5/18.

The Cinema is open.

  • There are two police details on site between 7a – 3p Monday – Friday. They are stationed on Binney and Cardinal Medeiros and are tasked with assisting pedestrians cross the streets safely.
  • Binney Street is open as a one-way “Share the Road” (bicycles & vehicles) lane going eastbound.
  • Wayfinding for cinema and day care is installed. The plaza is closed to all pedestrians. All patrons of the cinema and daycare need to enter through the main garage entrance and follow signage and striping.

The following activity involves the use of heavy construction and trucking equipment and will create noise.

  • Trucking for delivery of materials to the site
  • Trucking for removal of materials from the site
  • Spray fireproofing underway
  • Exterior façade installation begins
  • Concrete placement for floor slabs





Construction Update 4/30/18

Neighbors,

Below please find an update of the activity at the 399 Binney Street construction site anticipated for next week. Please reach out to a project team member directly with specific concerns. We will work with you to address specific issues. Working hours are Monday through Friday 7a - 6p and Saturday 9a-6p.  Please do not hesitate reaching out to any member of the team with any questions, concerns or comments.

The site will potentially be open on Saturday 4/28/18.

The Cinema is open.

  • There are two police details on site between 7a – 3p Monday – Friday. They are stationed on Binney and Cardinal Medeiros and are tasked with assisting pedestrians cross the streets safely.
  • Binney Street is open as a one-way “Share the Road” (bicycles & vehicles) lane going eastbound.
  • Wayfinding for cinema and day care is installed. The plaza is closed to all pedestrians. All patrons of the cinema and daycare need to enter through the main garage entrance and follow signage and striping.

The following activity involves the use of heavy construction and trucking equipment and will create noise.

  • Trucking for delivery of materials to the site
  • Trucking for removal of materials from the site
  • Delivery of mechanical equipment continues
  • Spray fireproofing underway
  • Exterior façade installation may begin
  • Concrete placement for floor slabs


Weekly Update 4/23/18

Neighbors,

Below please findan update of the activity at the 399 Binney Street construction site anticipated for next week. Please reach out to a project team member directly with specific concerns. We will work with you to address specific issues. Working hours are Monday through Friday 7a - 6p and Saturday 9a-6p.  Please do not hesitate reaching out to any member of the team with any questions, concerns or comments.

The site will potentially be open on Saturday 4/21/18.

The Cinema is open.

  • There are two police details on site between 7a – 3p Monday – Friday. They are stationed on Binney and Cardinal Medeiros and are tasked with assisting pedestrians cross the streets safely.
  • Binney Street is open as a one-way “Share the Road” (bicycles & vehicles) lane going eastbound.
  • Wayfinding for cinema and day care is installed. The plaza is closed to all pedestrians. All patrons of the cinema and daycare need to enter through the main garage entrance and follow signage and striping.

The following activity involves the use of heavy construction and trucking equipment and will create noise.

  • Trucking for delivery of materials to the site
  • Trucking for removal of materials from the site
  • Steel erection continues
  • Delivery of mechanical equipment continues
  • Concrete placement for floor slabs
  • Spray fireproofing is underway


Construction Update 4/16/18

Neighbors,

Below please find an update of the activity at the 399 Binney Street construction site anticipated for next week. Please reach out to a project team member directly with specific concerns. We will work with you to address specific issues. Working hours are Monday through Friday 7a - 6p and Saturday 9a-6p.  Please do not hesitate reaching out to any member of the team with any questions, concerns or comments.

The site will potentially be open on Saturday 4/14/18.

The site will be closed on Monday 4/16/18.

The Cinema is open.

  • There are two police details on site between 7a – 3p Monday – Friday. They are stationed on Binney and Cardinal Medeiros and are tasked with assisting pedestrians cross the streets safely.
  • Binney Street is open as a one-way “Share the Road” (bicycles & vehicles) lane going eastbound.
  • Wayfinding for cinema and day care is installed. The plaza is closed to all pedestrians. All patrons of the cinema and daycare need to enter through the main garage entrance and follow signage and striping.

The following activity involves the use of heavy construction and trucking equipment and will create noise.

  • Trucking for delivery of materials to the site
  • Trucking for removal of materials from the site
  • Steel erection continues
  • Delivery of mechanical equipment continues
  • Concrete placement for ground floor curbs
  • Concrete placement for floor slabs


Construction Update Week of 4/9/18

Neighbors,

Below please find an update of the activity at the 399 Binney Street construction site anticipated for next week. Please reach out to a project team member directly with specific questions, concerns or comments. We will work with you to address specific issues.

Working hours are Monday through Friday 7a - 6p and Saturday 9a-6p.  

Remember that during a City declared snow emergency the One Kendall Square parking garage is open for Cambridge residents.

The site will potentially be open on Saturday 4/7/18.

The Cinema is open.

  • There are two police details on site between 7a – 3p Monday – Friday. They are stationed on Binney and Cardinal Medeiros and are tasked with assisting pedestrians cross the streets safely.
  • Binney Street is open as a one-way “Share the Road” (bicycles & vehicles) lane going eastbound.
  • Dust control on the site is ongoing.
  • Wayfinding for cinema and day care is installed. The plaza is closed to all pedestrians. All patrons of the cinema and daycare need to enter through the main garage entrance and follow signage and striping.

The following activity involves the use of heavy construction and trucking equipment and will create noise.

  • Trucking for delivery of materials to the site
  • Trucking for removal of materials from the site
  • Steel deliveries and erection continues
  • Delivery of mechanical equipment continues
  • Concrete placement for second floor slab scheduled for Thursday 4/5. Note that this work is weather dependent


Construction Update Week of 4/2/18

Neighbors,


Below please find an update of the activity at the 399 Binney Street construction site anticipated for next week. Please reach out to a project team member directly with specific concerns. We will work with you to address specific issues. Working hours are Monday through Friday 7a - 6p and Saturday 9a-6p.  Please do not hesitate reaching out to any member of the team with any questions, concerns or comments.

Thank you to the neighbors that attended our project update last night.

Remember that during a City declared snow emergency the One Kendall Square parking garage is open for Cambridge residents.

The site will potentially be open on Saturday 3/31/18.

The Cinema is open.

  • There are two police details on site between 7a – 3p Monday – Friday. They are stationed on Binney and Cardinal Medeiros and are tasked with assisting pedestrians cross the streets safely.
  • Binney Street is open as a one-way “Share the Road” (bicycles & vehicles) lane going eastbound.
  • Dust control on the site is ongoing.
  • Wayfinding for cinema and day care is installed. The plaza is closed to all pedestrians. All patrons of the cinema and daycare need to enter through the main garage entrance and follow signage and striping.

The following activity involves the use of heavy construction and trucking equipment and will create noise.

  • Trucking for delivery of materials to the site
  • Trucking for removal of materials from the site
  • Steel erection continues
  • Installation of temporary lighting
  • Delivery of mechanical equipment continues
  • Concrete placement for ground floor curbs
  • Concrete placement for floor slabs

Construction Update Week of 3/26/18

Neighbors,

Below please find an update of the activity at the 399 Binney Street construction site anticipated for next week. Please reach out to a project team member directly with specific concerns. We will work with you to address specific issues. Working hours are Monday through Friday 7a - 6p and Saturday 9a-6p.  Please do not hesitate reaching out to any member of the team with any questions, concerns or comments.

Remember that during a City declared snow emergency the One Kendall Square parking garage is open for Cambridge residents.

We will be hosting a Community Meeting on Wednesday March 28th to discuss construction progress on the building. The update will be held in the atrium adjacent to 600/700 One Kendall Square from 7-8p.

The site will potentially be open on Saturday, 3/24/18.

The Cinema is open.

  • There are two police details on site between 7a – 3p Monday – Friday. They are stationed on Binney and Cardinal Medeiros and are tasked with assisting pedestrians cross the streets safely.
  • Binney Street is open as a one-way “Share the Road” (bicycles & vehicles) lane going eastbound.
  • Dust control on the site is ongoing.
  • Wayfinding for cinema and day care is installed. The plaza is closed to all pedestrians. All patrons of the cinema and daycare need to enter through the main garage entrance and follow signage and striping.

The following activity involves the use of heavy construction and trucking equipment and will create noise.

  • Trucking for delivery of materials to the site
  • Trucking for removal of materials from the site
  • Steel erection continues
  • Delivery of mechanical equipment continues
  • Installation of tarp enclosure around the building
  • Concrete placement for ground floor curbs



399 Binney Street Update - Wednesday March 28th 7-8p

Neighbors,

Please join us for an in-person update for the 399 Binney Street construction project on Wednesday March 28th from 7-8p in the atrium of 600/700 One Kendall Square. Members of the construction, development and asset teams will be available to answer questions. Light refreshments will be served. Parking at the One Kendall Square Garage will be validated (please bring your parking ticket to the event).

Wayfinding signs will be posted on Binney and Hampshire Streets the evening of the event.

We look forward to seeing you next week!


Construction Update Week of 3/19/18

Neighbors,


Below please find an update of the activity at the 399 Binney Street construction site anticipated for next week. Please reach out to a project team member directly with specific concerns. We will work with you to address specific issues. Working hours are Monday through Friday 7a - 6p and Saturday 9a-6p.  Please do not hesitate reaching out to any member of the team with any questions, concerns or comments.

Remember that during a City declared snow emergency the One Kendall Square parking garage is open for Cambridge residents.

We will be hosting a Community Meeting on Wednesday March 28th to discuss construction progress on the building. The update will be held in the atrium adjacent to 600/700 One Kendall Square from 7-8p. A separate invitation will be sent out shortly.

The site will potentially be open on Saturday, 3/17/18; see below note for street closing information.

Saturday 3/17/18 there will be a one-day crane set up on Cardinal Medeiros Ave near OKS B700, which will be used to hoist mechanical equipment to roof of OKS B700. Cardinal Medeiros Ave will be closed to traffic going both ways. The closure is being coordinated with the City. Police details will be on site to direct traffic and the crane will be removed at the end of the day, at which point the street will be re-opened.

Binney Street is scheduled to be closed from Tuesday March 20th through Friday March 23rd  for the breakdown and removal of the large steel crane.

The Cinema is open.

  • There are two police details on site between 7a – 3p Monday – Friday. They are stationed on Binney and Cardinal Medeiros and are tasked with assisting pedestrians cross the streets safely.
  • Binney Street is open as a one-way “Share the Road” (bicycles & vehicles) lane going eastbound.
  • Dust control on the site is ongoing.
  • Wayfinding for cinema and day care is installed. The plaza is closed to all pedestrians. All patrons of the cinema and daycare need to enter through the main garage entrance and follow signage and striping.

The following activity involves the use of heavy construction and trucking equipment and will create noise.

  • Trucking for delivery of materials to the site
  • Trucking for removal of materials from the site
  • Steel erection continues
  • Delivery of mechanical equipment continues


Construction Update Week of 3/12/18

Neighbors,

Below please find an update of the activity at the 399 Binney Street construction site anticipated for next week. Please reach out to a project team member directly with specific concerns. We will work with you to address specific issues. Working hours are Monday through Friday 7a - 6p and Saturday 9a-6p.  Please do not hesitate reaching out to any member of the team with any questions, concerns or comments.

We will be hosting a Community Meeting on Wednesday March 28th to discuss construction progress on the building. More details to come about time and location, but please save the date.

The site will potentially be open on Saturday, 3/10/18.

Saturday 3/17/18 there will be a one-day crane set up on Cardinal Medeiros Ave near OKS B700, which will be used to hoist mechanical equipment to roof of OKS B700. Cardinal Medeiros Ave will be closed to traffic going both ways. The closure is being coordinated with the City. Police details will be on site to direct traffic and the crane will be removed at the end of the day, at which point the street will be re-opened.

The Cinema is open.

  • There are two police details on site between 7a – 3p Monday – Friday. They are stationed on Binney and Cardinal Medeiros and are tasked with assisting pedestrians cross the streets safely.
  • Binney Street is open as a one-way “Share the Road” (bicycles & vehicles) lane going eastbound.
  • Dust control on the site is ongoing.
  • Wayfinding for cinema and day care is installed. The plaza is closed to all pedestrians. All patrons of the cinema and daycare need to enter through the main garage entrance and follow signage and striping.

The following activity involves the use of heavy construction and trucking equipment and will create noise.

  • Trucking for delivery of materials to the site
  • Trucking for removal of materials from the site
  • Steel erection continues


Weekly Construction Update 3/5/18

Neighbors,

Below please find an update of the activity at the 399 Binney Street construction site anticipated for next week. Please reach out to a project team member directly with specific concerns. We will work with you to address specific issues. Working hours are Monday through Friday 7a - 6p and Saturday 9a-6p.  Please do not hesitate reaching out to any member of the team with any questions, concerns or comments.

We will be hosting a Community Meeting on Wednesday March 28th to discuss construction progress on the building. More details to come about time and location, but save the date.

The site will potentially be open on Saturday, 3/3/18.

Saturday 3/17/18 there will be a one-day crane set up on Cardinal Medeiros Ave near OKS B700, which will be used to hoist mechanical equipment to roof of OKS B700. Cardinal Medeiros Ave will be closed to traffic going both ways. The closure is being coordinated with the City. Police details will be on site to direct traffic and the crane will be removed at the end of the day, at which point the street will be re-opened.

The Cinema is open.

  • There are two police details on site between 7a – 3p Monday – Friday. They are stationed on Binney and Cardinal Medeiros and are tasked with assisting pedestrians cross the streets safely.
  • Binney Street is open as a one-way “Share the Road” (bicycles & vehicles) lane going eastbound.
  • Dust control on the site is ongoing.
  • Wayfinding for cinema and day care is installed. The plaza is closed to all pedestrians. All patrons of the cinema and daycare need to enter through the main garage entrance and follow signage and striping.

The following activity involves the use of heavy construction and trucking equipment and will create noise.

  • Trucking for delivery of materials to the site
  • Trucking for removal of materials from the site
  • Slab on grade concrete placement


Construction Update Week of 2/26/18

Today, 2/23/18, a non-emergency level gas leak was detected on Cardinal Medeiros, in the vicinity of previous Eversource repairs. An Eversource crew was dispatched to address the issue. The area will be plated over tonight and repairs will resume as early as 8am tomorrow with a targeted completion of end of day on Saturday, 2/24/18. Due to the proximity of the repairs to the work-site, access within the work-site perimeter will be granted to Eversource as requested.


Neighbors,

Below please find an update of the activity at the 399 Binney Street construction site anticipated for next week. Please reach out to a project team member directly with specific concerns. We will work with you to address specific issues. Working hours are Monday through Friday 7a - 6p and Saturday 9a-6p.  Please do not hesitate reaching out to any member of the team with any questions, concerns or comments.

The site will potentially be open on Saturday, 2/24/18.

The Cinema is open.

  • There are two police details on site between 7a – 3p Monday – Friday. They are stationed on Binney and Cardinal Medeiros and are tasked with assisting pedestrians cross the streets safely.
  • Binney Street is open as a one-way “Share the Road” (bicycles & vehicles) lane going eastbound.
  • Dust control on the site is ongoing.
  • Wayfinding for cinema and day care is installed. The plaza is closed to all pedestrians. All patrons of the cinema and daycare need to enter through the main garage entrance and follow signage and striping.

The following activity involves the use of heavy construction and trucking equipment and will create noise.

  • Trucking for delivery of materials to the site
  • Trucking for removal of materials from the site
  • Mobilization and removal of the support of excavation braces
  • Slab on grade concrete placement
  • Mobilization of material and equipment for basement spray proofing


Construction Update Week of 2/19/18

Neighbors,


Below please find an update of the activity at the 399 Binney Street construction site anticipated for next week. Please

reach out to a project team member directly with specific concerns. We will work with you to address specific issues. Working hours are Monday through Friday 7a - 6p and Saturday 9a-6p.  Please do not hesitate reaching out to any member of the team with any questions, concerns or comments.

The site will be active Saturday February 17th.

The site will be closed Monday February 19th.

The One Kendall Square site has a crane delivery that will close Cardinal Medeiros on Saturday February 17th.  

Binney Street may be closed on Wednesday February 21st until completion of work on Thursday February 22nd.

Reminder: during City of Cambridge declared Snow Emergencies the One Kendall Square Parking Garage is open and available free of charge for Cambridge residents


The Cinema is open.

  • There are two police details on site between 7a – 3p Monday – Friday. They are stationed on Binney and Cardinal Medeiros and are tasked with assisting pedestrians cross the streets safely.
  • Binney Street is open as a one-way “Share the Road” (bicycles & vehicles) lane going eastbound.
  • Dust control on the site is ongoing.
  • Wayfinding for cinema and day care is installed. The plaza is closed to all pedestrians. All patrons of the cinema and daycare need to enter through the main garage entrance and follow signage and striping.

The following activity involves the use of heavy construction and trucking equipment and will create noise.

  • Trucking for delivery of materials to the site
  • Trucking for removal of materials from the site
  • Mobilization and start the removal of the support of excavation braces
  • Slab on grade concrete placement
  • Mobilization of material and equipment for basement spray proofing


Construction Update Week of 2/12/18

Neighbors,


Below please find an update of the activity at the 399 Binney Street construction site anticipated for next week. Please reach out to a project team member directly with specific concerns. We will work with you to address specific issues. Working hours are Monday through Friday 7a - 6p and Saturday 9a-6p.  Please do not hesitate reaching out to any member of the team with any questions, concerns or comments.

The One Kendall Square site will be active Saturday February 10th and Sunday February 11th 

A mechanical equipment upgrade project at Buildings 600 & 700 One Kendall Square will necessitate a large crane to hoist steel and equipment to the roof and subsequent Cardinal Medeiros road closure on Saturday February 10th & 11th. During the closure a police detail at Cambridge Street will direct local traffic while preventing large trucks from the route. The project will begin at 7a (vs 9a) to allow it to potentially be completed in one day. We are working with a number of City departments to ensure this project goes as smoothly and as quickly as possible.

Reminder: during City of Cambridge declared Snow Emergencies the One Kendall Square Parking Garage is open and available free of charge for Cambridge residents


The Cinema is open.

  • There are two police details on site between 7a – 3p Monday – Friday. They are stationed on Binney and Cardinal Medeiros and are tasked with assisting pedestrians cross the streets safely.
  • Binney Street is open as a one-way “Share the Road” (bicycles & vehicles) lane going eastbound.
  • Dust control on the site is ongoing.
  • Wayfinding for cinema and day care is installed. The plaza is closed to all pedestrians. All patrons of the cinema and daycare need to enter through the main garage entrance and follow signage and striping.

The following activity involves the use of heavy construction and trucking equipment and will create noise.

  • Trucking for delivery of materials to the site
  • Trucking for removal of materials from the site
  • Mobilization and start the removal of the support of excavation braces
  • Slab on grade concrete placement


Weekly Construction Update 2/5/18

Neighbors,

Below please find an update of the activity at the 399 Binney Street construction site anticipated for next week. Please reach out to a project team member directly with specific concerns. We will work with you to address specific issues. Working hours are Monday through Friday 7a - 6p and Saturday 9a-6p.  Please do not hesitate reaching out to any member of the team with any questions, concerns or comments.


The site will be active Saturday February 3rd


A mechanical equipment upgrade project at Buildings 600 & 700 One Kendall Square will necessitate a large crane to hoist steel and equipment to the roof and subsequent Cardinal Medeiros road closure on Saturday February 10th & 11th. During the closure a police detail at Cambridge Street will direct local traffic while preventing large trucks from the route. The project will begin at 7a (vs 9a) to allow it to potentially be completed in one day. We are working with a number of City departments to ensure this project goes as smoothly and as quickly as possible.


Reminder: during City of Cambridge declared Snow Emergencies the One Kendall Square Parking Garage is open and available free of charge for Cambridge residents


The Cinema is open.

  • There are two police details on site between 7a – 3p Monday – Friday. They are stationed on Binney and Cardinal Medeiros and are tasked with assisting pedestrians cross the streets safely.
  • Binney Street is open as a one-way “Share the Road” (bicycles & vehicles) lane going eastbound.
  • Dust control on the site is ongoing.
  • Wayfinding for cinema and day care is installed. The plaza is closed to all pedestrians. All patrons of the cinema and daycare need to enter through the main garage entrance and follow signage and striping.

The following activity involves the use of heavy construction and trucking equipment and will create noise.

  • Trucking for delivery of materials to the site
  • Trucking for removal of materials from the site
  • Mobilization and start the removal of the support of excavation braces
  • Removal of building foundation along Binney Street

Construction Update Week of 1/29/18

Neighbors,

Below please find an update of the activity at the 399 Binney Street construction site anticipated for next week. Please reach out to a project team member directly with specific concerns. We will work with you to address specific issues. Working hours are Monday through Friday 7a - 6p and Saturday 9a-6p.  Please do not hesitate reaching out to any member of the team with any questions, concerns or comments.

The site will be active Saturday January 27th

A mechanical equipment upgrade project at Buildings 600 & 700 One Kendall Square will necessitate a large crane to hoist steel and equipment to the roof and subsequent Cardinal Medeiros road closure on Saturday February 10th & 11th. During the closure a police detail at Cambridge Street will direct local traffic while preventing large trucks from the route. The project will begin at 7a (vs 9a) to allow it to potentially be completed in one day. We are working with a number of City departments to ensure this project goes as smoothly and as quickly as possible.

Reminder: during City of Cambridge declared Snow Emergencies the One Kendall Square Parking Garage is open and available free of charge for Cambridge residents


The Cinema is open.

  • There are two police details on site between 7a – 3p Monday – Friday. They are stationed on Binney and Cardinal Medeiros and are tasked with assisting pedestrians cross the streets safely.
  • Binney Street is open as a one-way “Share the Road” (bicycles & vehicles) lane going eastbound.
  • Dust control on the site is ongoing.
  • Wayfinding for cinema and day care is installed. The plaza is closed to all pedestrians. All patrons of the cinema and daycare need to enter through the main garage entrance and follow signage and striping.

The following activity involves the use of heavy construction and trucking equipment and will create noise.

  • Trucking for delivery of materials to the site
  • Trucking for removal of materials from the site
  • Building steel erection and placement of metal decking
  • Delivery of rebar and formwork for the placement of the first floor slab
  • Installation of the ground floor slab concrete pouring and placement
  • Removal of building foundation along Binney Street


Construction Update Week of 1/22/18

Neighbors,


Below please find an update of the activity at the 399 Binney Street construction site anticipated for next week. Please reach out to a project team member directly with specific concerns. We will work with you to address specific issues. Working hours are Monday through Friday 7a - 6p and Saturday 9a-6p.  Please do not hesitate reaching out to any member of the team with any questions, concerns or comments.

The site will be active Saturday January 20th

Reminder: during City of Cambridge declared Snow Emergencies the One Kendall Square Parking Garage is open and available free of charge for Cambridge residents

The Cinema is open.

  • There are two police details on site between 7a – 3p Monday – Friday. They are stationed on Binney and Cardinal Medeiros and are tasked with assisting pedestrians cross the streets safely.
  • Binney Street is open as a one-way “Share the Road” (bicycles & vehicles) lane going eastbound.
  • Dust control on the site is ongoing.
  • Wayfinding for cinema and day care is installed. The plaza is closed to all pedestrians. All patrons of the cinema and daycare need to enter through the main garage entrance and follow signage and striping.

The following activity involves the use of heavy construction and trucking equipment and will create noise.

  • Trucking for delivery of materials to the site
  • Trucking for removal of materials from the site
  • Building steel erection and placement of metal decking
  • Delivery of rebar and formwork for the placement of the first floor slab
  • Installation of the first floor slab concrete pouring and placement
  • Removal of building foundation along Binney Street


Construction Update Week of 1/15/18

Neighbors,

Below please find an update of the activity at the 399 Binney Street construction site anticipated for next week. Please reach out to a project team member directly with specific concerns. We will work with you to address specific issues. Working hours are Monday through Friday 7a - 6p and Saturday 9a-6p.  Please do not hesitate reaching out to any member of the team with any questions, concerns or comments.

The site will be active Saturday January 13th and Monday January 15th

Reminder: during City of Cambridge declared Snow Emergencies the One Kendall Square Parking

Garage is open and available free of charge for Cambridge residents

The Cinema is open.

  • There are two police details on site between 7a – 3p Monday – Friday. They are stationed on Binney and Cardinal Medeiros and are tasked with assisting pedestrians cross the streets safely.
  • Binney Street is open as a one-way “Share the Road” (bicycles & vehicles) lane going eastbound.
  • Dust control on the site is ongoing.
  • Wayfinding for cinema and day care is installed. The plaza is closed to all pedestrians. All patrons of the cinema and daycare need to enter through the main garage entrance and follow signage and striping.

The following activity involves the use of heavy construction and trucking equipment and will create noise.

  • Trucking for delivery of steel to the site
  • Trucking for removal of materials from the site
  • Building steel erection and placement of metal decking
  • Preparation for installation of the first floor slab concrete pouring and placement
  • Removal of building foundation along Binney Street


Construction Update Week of 1/8/18

Neighbors,

Happy New Year!

Below please find an update of the activity at the 399 Binney Street construction site anticipated for next week. Please reach out to a project team member directly with specific concerns. We will work with you to address specific issues. Working hours are Monday through Friday 7a - 6p and Saturday 9a-6p.  Please do not hesitate reaching out to any member of the team with any questions, concerns or comments.

Reminder: during City of Cambridge declared Snow Emergencies the One Kendall Square Parking Garage is open and available free of charge for Cambridge residents

The Cinema is open.

  • There are two police details on site between 7a – 3p Monday – Friday. They are stationed on Binney and Cardinal Medeiros and are tasked with assisting pedestrians cross the streets safely.
  • Binney Street is open as a one-way “Share the Road” (bicycles & vehicles) lane going eastbound.
  • Dust control on the site is ongoing.
  • Wayfinding for cinema and day care is installed. The plaza is closed to all pedestrians. All patrons of the cinema and daycare need to enter through the main garage entrance and follow signage and striping.

The following activity involves the use of heavy construction and trucking equipment and will create noise.

  • Trucking for delivery of steel to the site
  • Trucking for removal of materials from the site
  • Removal of old building foundation along Binney Street
  • Building steel erection and placement of metal decking


Construction Update 12/25/17

Neighbors,

Happy Holidays! Below please find an update of the activity at the 399 Binney Street construction site anticipated for next week. Please reach out to a project team member directly with specific concerns. We will work with you to address specific issues. Working hours are Monday through Friday 7a - 6p and Saturday 9a-6p.  Please do not hesitate reaching out to any member of the team with any questions, concerns or comments.

The site will be closed on December 25th for the holiday.

The Cinema is open.

  • There are two police details on site between 7a – 3p Monday – Friday. They are stationed on Binney and Cardinal Medeiros and are tasked with assisting pedestrians cross the streets safely.
  • Binney Street is open as a one-way “Share the Road” (bicycles & vehicles) lane going eastbound.
  • Dust control on the site is ongoing.
  • Wayfinding for cinema and day care is installed. The plaza is closed to all pedestrians. All patrons of the cinema and daycare need to enter through the main garage entrance and follow signage and striping.

The following activity involves the use of heavy construction and trucking equipment and will create noise.

  • Trucking for delivery of steel to the site
  • Commencement of steel erection

Weekly Construction Update 12/18/17

Neighbors,  

Below please find an update of the activity at the 399 Binney Street construction site anticipated for next week. Please reach out to a project team member directly with specific concerns. We will work with you to address specific issues. Working hours are Monday through Friday 7a - 6p and Saturday 9a-6p.  Please do not hesitate reaching out to any member of the team with any questions, concerns or comments.

On December 15th the site will remain open late in order to finalize the crane slab placement. We will have extra police details on site to assist pedestrians.

Binney Street will be closed to eastbound traffic on Dec 18th & 19th for crane set ups.

The Cinema is open.

  • There are two police details on site between 7a – 3p Monday – Friday. They are stationed on Binney and Cardinal Medeiros and are tasked with assisting pedestrians cross the streets safely.
  • Binney Street is open as a one-way “Share the Road” (bicycles & vehicles) lane going eastbound.
  • Dust control on the site is ongoing.
  • Wayfinding for cinema and day care is installed. The plaza is closed to all pedestrians. All patrons of the cinema and daycare need to enter through the main garage entrance and follow signage and striping.

The following activity involves the use of heavy construction and trucking equipment and will create noise.

  • Trucking for steel deliveries
  • Assembly of the steel crane
  • Commencement steel erection


Weekly Construction Update 1/1/18

Neighbors,

Happy New Year! Below please find an update of the activity at the 399 Binney Street construction site anticipated for next week. Please reach out to a project team member directly with specific concerns. We will work with you to address specific issues. Working hours are Monday through Friday 7a - 6p and Saturday 9a-6p.  Please do not hesitate reaching out to any member of the team with any questions, concerns or comments.

The site will be closed on January 1st for the holiday.

The Cinema is open.

  • There are two police details on site between 7a – 3p Monday – Friday. They are stationed on Binney and Cardinal Medeiros and are tasked with assisting pedestrians cross the streets safely.
  • Binney Street is open as a one-way “Share the Road” (bicycles & vehicles) lane going eastbound.
  • Dust control on the site is ongoing.
  • Wayfinding for cinema and day care is installed. The plaza is closed to all pedestrians. All patrons of the cinema and daycare need to enter through the main garage entrance and follow signage and striping.

The following activity involves the use of heavy construction and trucking equipment and will create noise.

  • Trucking for delivery of steel to the site
  • Commencement of steel erection


Weekly Construction Update 12/11/17

Neighbors,

Below please find an update of the activity at the 399 Binney Street construction site anticipated for next week. Please reach out to a project team member directly with specific concerns. We will work with you to address specific issues. Working hours are Monday through Friday 7a - 6p and Saturday 9a-6p.  Please do not hesitate reaching out to any member of the team with any questions, concerns or comments.

On December 15th the site will remain open late in order to finalize the crane slab placement. We will have extra police details on site to assist pedestrians.

Binney Street will be closed to eastbound traffic on Dec, 14th, Dec 18th & 19th for crane set ups.

The Cinema is open.

  • There are two police details on site between 7a – 3p Monday – Friday. They are stationed on Binney and Cardinal Medeiros and are tasked with assisting pedestrians cross the streets safely.
  • Binney Street is open as a one-way “Share the Road” (bicycles & vehicles) lane going eastbound.
  • Dust control on the site is ongoing.
  • Wayfinding for cinema and day care is installed. The plaza is closed to all pedestrians. All patrons of the cinema and daycare need to enter through the main garage entrance and follow signage and striping.

The following activity involves the use of heavy construction and trucking equipment and will create noise.

  • Site excavation and hauling work
  • Final foundation wall will take place Monday December 11th
  • Demobilization of foundation wall material
  • Preparation for the slab on grade placement and anticipated placement of the first section
  • Foundation rebar deliveries will continue requiring a crane onsite to lower material into the excavation
  • Trucking for removal of material from the site
  • Removal of storage containers from the site and relocate dewatering tank inside the site
  • Assembly of the steel crane
  • Anticipated commencement of steel erection

Weekly Construction Update 12/4/17

Neighbors,


Below please find an update of the activity at the 399 Binney Street construction site anticipated for next week. Please reach out to a project team member directly with specific concerns. We will work with you to address specific issues. Working hours are Monday through Friday 7a - 6p and Saturday 9a-6p.  Please do not hesitate reaching out to any member of the team with any questions, concerns or comments .

The Cinema is open.

  • There are two police details on site between 7a – 3p Monday – Friday. They are stationed on Binney and Cardinal Medeiros and are tasked with assisting pedestrians cross the streets safely.
  • Binney Street is open as a one-way “Share the Road” (bicycles & vehicles) lane going eastbound.
  • Dust control on the site is ongoing.
  • Wayfinding for cinema and day care is installed. The plaza is closed to all pedestrians. All patrons of the cinema and daycare need to enter through the main garage entrance and follow signage and striping.

The following activity involves the use of heavy construction and trucking equipment and will create noise.

  • Site excavation and hauling work
  • Form and place concrete foundations
  • Preparation for the slab on grade placement and anticipated placement of the first section
  • Foundation rebar deliveries will continue requiring a crane onsite to lower material into the excavation
  • Trucking for removal of material from the site
  • Removal of storage containers from the site and relocate dewatering tank inside the site
  • Assembly of the steel crane

Weekly Construction Update 11/27/17

Neighbors,

 

Below please find an update of the activity at the 399 Binney Street construction site anticipated for next week. Please reach out to a project team member directly with specific concerns. We will work with you to address specific issues. Working hours are Monday through Friday 7a - 6p and Saturday 9a-6p.  Please do not hesitate reaching out to any member of the team with any questions, concerns or comments.


The Cinema is open.


Cambridge Water Department may be shutting off the 8” water main along Cardinal Medeiros Ave and Binney Street on Saturday 11/25/17 to allow completion of the cut and cap of an old water pipe. Per Water Department officials, residents along Cardinal Medeiros will not be affected by this work, however the OKS campus will be affected. Measures are being put in place to ensure retail and restaurants may remain open during this work.

  • There are two police details on site between 7a – 3p Monday – Friday. They are stationed on Binney and Cardinal Medeiros and are tasked with assisting pedestrians cross the streets safely.
  • Binney Street is open as a one-way “Share the Road” (bicycles & vehicles) lane going eastbound.
  • Dust control on the site is ongoing.
  • Wayfinding for cinema and day care is installed. The plaza is closed to all pedestrians. All patrons of the cinema and daycare need to enter through the main garage entrance and follow signage and striping.

The following activity involves the use of heavy construction and trucking equipment and will create noise.

  • Site excavation and hauling work
  • Form and place concrete foundations
  • Foundation rebar deliveries will continue requiring a crane onsite to lower material into the excavation
  • Trucking for removal of material from the site
  • Removal of storage containers from the site and relocate dewatering tank inside the site
  • Digging and installation of new water lines on Cardinal Medeiros
  • Utility work in Binney Street


Inquiries about the gas pipe situation should be directed directly to Bill Zamparelli at Eversource (full contact information below).


Bill Zamparelli

Eversource Community Relations Representative


Eversource Somerville Service Center

101 Linwood Street

Somerville MA 02143


Phone:   617-629-3265

E-mail:   william.zamparelli@eversource.com

Eversource Work Update

As a follow up to a neighbor’s question about street closures due to the Eversource work, below is an update that our team learned this morning.

 

According to Eversource representatives, they have patched the leak and will be backfilling over the weekend. Binney Street will remain closed at least through the weekend. Further inquiries about the situation should be directed directly to Bill Zamparelli at Eversource (full contact information below).


Bill Zamparelli

Eversource Community Relations Representative


Eversource Somerville Service Center

101 Linwood Street

Somerville MA 02143


Phone:   617-629-3265

E-mail:   william.zamparelli@eversource.com

Weekly Construction Update 11/20/17

Neighbors,

 

Below please find an update of the activity at the 399 Binney Street construction site anticipated for next week. Please reach out to a project team member directly with specific concerns. We will work with you to address specific issues. Working hours are Monday through Friday 7a - 6p and Saturday 9a-6p.  Please do not hesitate reaching out to any member of the team with any questions, concerns or comments.


The Cinema is open.


The site will be closed on Thursday November 23rd for Thanksgiving.


Cambridge Water Department will be shutting off the 20” water main along Cardinal Medeiros Ave and Binney Street on Saturday 11/18/17 between 7-7:30am so that an old water service can be cut and capped. We have requested four police officers for the day to assist with pedestrian and vehicular traffic. Per Water Department officials, residents along Cardinal Medeiros will not be affected by this work, however the OKS campus will be affected. Measures are being put in place to ensure retail and restaurants may remain open during this work.

  • There are two police details on site between 7a – 3p Monday – Friday. They are stationed on Binney and Cardinal Medeiros and are tasked with assisting pedestrians cross the streets safely.
  •  Binney Street is open as a one-way “Share the Road” (bicycles & vehicles) lane going eastbound.
  • Dust control on the site is ongoing.
  • Wayfinding for cinema and day care is installed. The plaza is closed to all pedestrians. All patrons of the cinema and daycare need to enter through the main garage entrance and follow signage and striping.

The following activity involves the use of heavy construction and trucking equipment and will create noise.

  • Site excavation and hauling work
  • Form and place concrete foundations
  • Foundation rebar deliveries will continue requiring a crane onsite to lower material into the excavation
  • Trucking for removal of material from the site
  • Digging and installation of new water lines on Cardinal Medeiros
  • Utility work in Binney Street


Weekly Construction Update 11/13/17


Neighbors,

 

Below please find an update of the activity at the 399 Binney Street construction site anticipated for next week. Please reach out to a project team member directly with specific concerns. We will work with you to address specific issues. Working hours are Monday through Friday 7a - 6p and Saturday 9a-6p.  Please do not hesitate reaching out to any member of the team with any questions, concerns or comments.


The Cinema is open.


  • There are two police details on site between 7a – 3p Monday – Friday. They are stationed on Binney and Cardinal Medeiros and are tasked with assisting pedestrians cross the streets safely.
  • Binney Street is open as a one-way “Share the Road” (bicycles & vehicles) lane going eastbound.
  • Dust control on the site is ongoing.
  • Wayfinding for cinema and day care is installed. The plaza is closed to all pedestrians. All patrons of the cinema and daycare need to enter through the main garage entrance and follow signage and striping.

The following activity involves the use of heavy construction and trucking equipment and will create noise.

  • Site excavation and hauling work
  • Form and place concrete foundations
  • Foundation rebar deliveries will continue requiring a crane onsite to lower material into the excavation
  • Trucking for removal of material from the site
  • Digging and installation of new water lines on Cardinal Medeiros
  • Utility work in Binney Street

Weekly construction Update 11/6/17

Neighbors,

 

Below please find an update of the activity at the 399 Binney Street construction site anticipated for next week. Please reach out to a project team member directly with specific concerns. We will work with you to address specific issues. Working hours are Monday through Friday 7a - 6p and Saturday 9a-6p.  Please do not hesitate reaching out to any member of the team with any questions, concerns or comments .


The Cinema is open.

  • There are two police details on site between 7a – 3p Monday – Friday. They are stationed on Binney and Cardinal Medeiros and are tasked with assisting pedestrians cross the streets safely.
  • Binney Street is open as a one-way “Share the Road” (bicycles & vehicles) lane going eastbound.
  • Dust control on the site is ongoing.
  • Wayfinding for cinema and day care is installed. The plaza is closed to all pedestrians. All patrons of the cinema and daycare need to enter through the main garage entrance and follow signage and striping.

The following activity involves the use of heavy construction and trucking equipment and will create noise.

  • Site excavation and hauling work
  • Form and place concrete foundations
  • Foundation rebar deliveries will continue requiring a crane onsite to lower material into the excavation
  • Trucking for removal of material from the site
  • Digging and installation of new water lines on Cardinal Medeiros
  • Utility work in Binney Street

Weekly Construction Update 10/30/17

Neighbors,

 

Below please find an update of the activity at the 399 Binney Street construction site anticipated for next week. Please reach out to a project team member directly (see attached Construction Project Team Contact List) with specific concerns. We will work with you to address specific issues. Working hours are Monday through Friday 7a - 6p and Saturday 9a-6p.  Please do not hesitate reaching out to any member of the team with any questions, concerns or comments (contact list attached).


The Cinema is open.


  • There are two police details on site between 7a – 3p Monday – Friday. They are stationed on Binney and Cardinal Medeiros and are tasked with assisting pedestrians cross the streets safely.
  • Binney Street is open as a one-way “Share the Road” (bicycles & vehicles) lane going eastbound.
  • Dust control on the site is ongoing.
  • Wayfinding for cinema and day care is installed. The plaza is closed to all pedestrians. All patrons of the cinema and daycare need to enter through the main garage entrance and follow signage and striping.

The following activity involves the use of heavy construction and trucking equipment and will create noise.

  • Site excavation and hauling work
  • Form and place concrete foundations
  • Foundation rebar deliveries will continue requiring a crane onsite to lower material into the excavation
  • Trucking for removal of material from the site
  • Digging and installation of new water lines on Cardinal Medeiros
  • Utility work in Binney Street

Weekly Construction Update 10/23/17

Neighbors,

Below please find an update of the activity at the 399 Binney Street construction site anticipated for next week. Please reach out to a project team member directlywith specific concerns. We will work with you to address specific issues. Working hours are Monday through Friday 7a - 6p and Saturday 9a-6p.  Please do not hesitate reaching out to any member of the team with any questions, concerns or comments .

The Cinema is open.

  • There are two police details on site between 7a – 3p Monday – Friday. They are stationed on Binney and Cardinal Medeiros and are tasked with assisting pedestrians cross the streets safely.
  • Binney Street is open as a one-way “Share the Road” (bicycles & vehicles) lane going eastbound.
  • Dust control on the site is ongoing.
  • Wayfinding for cinema and day care is installed. The plaza is closed to all pedestrians. All patrons of the cinema and daycare need to enter through the main garage entrance and follow signage and striping.

The following activity involves the use of heavy construction and trucking equipment and will create noise.

  • Site excavation and hauling work
  • Form and place concrete foundations
  • Foundation rebar deliveries will continue requiring a crane onsite to lower material into the excavation
  • Trucking for removal of material from the site
  • Digging of utility pits on Cardinal Medeiros and Binney Street
  • Utility work in Binney Street

Weekly Construction Update 10/16/17

Neighbors,

 

Below please find an update of the activity at the 399 Binney Street construction site anticipated for next week. Please reach out to a project team member directly with specific concerns. We will work with you to address specific issues. Working hours are Monday through Friday 7a - 6p and Saturday 9a-6p.  Please do not hesitate reaching out to any member of the team with any questions, concerns or comments.


The Cinema is open.


  • There are two police details on site between 7a – 3p Monday – Friday. They are stationed on Binney and Cardinal Medeiros and are tasked with assisting pedestrians cross the streets safely.
  • Binney Street is open as a one-way “Share the Road” (bicycles & vehicles) lane going eastbound.
  • Dust control on the site is ongoing.
  • Wayfinding for cinema and day care is installed. The plaza is closed to all pedestrians. All patrons of the cinema and daycare need to enter through the main garage entrance and follow signage and striping.

The following activity involves the use of heavy construction and trucking equipment and will create noise.

  • Site excavation and hauling work
  • Form and place concrete foundations
  • Foundation rebar deliveries will continue requiring a crane onsite to lower material into the excavation
  • Trucking for removal of material from the site
  • Digging of utility pits on Cardinal Medeiros and Binney Street
  • Mulch installation at the garage entrance
  • Utility work in Binney Street

Weekly Construction Update 10/9/17

Neighbors,

Below please find an update of the activity at the 399 Binney Street construction site anticipated for next week. Please reach out to a project team member directly with specific concerns. We will work with you to address specific issues. Working hours are Monday through Friday 7a - 6p and Saturday 9a-6p.  Please do not hesitate reaching out to any member of the team with any questions, concerns or comments.

Please note Monday October 9th is a holiday for the site.

The Cinema is open.

  • There are two police details on site between 7a – 3p Monday – Friday. They are stationed on Binney and Cardinal Medeiros and are tasked with assisting pedestrians cross the streets safely.
  • Binney Street is open as a one-way “Share the Road” (bicycles & vehicles) lane going eastbound. Note street closure on Monday October 2 notice above
  • Dust control on the site is ongoing.
  • Wayfinding for cinema and day care is installed. The plaza is closed to all pedestrians. All patrons of the cinema and daycare need to enter through the main garage entrance and follow signage and striping.

The following activity involves the use of heavy construction and trucking equipment and will create noise.

  • Site excavation and hauling work
  • Form and place concrete foundations
  • Foundation rebar deliveries will continue requiring a crane onsite to lower material into the excavation
  • Trucking for removal of material from the site
  •  Digging of utility pits on Cardinal Medeiros and Binney Street
  • Utility work in Binney Street

Weekly Construction Update 10/2/17

Neighbors,

Below please find an update of the activity at the 399 Binney Street construction site anticipated for next week. Please reach out to a project team member directly with specific concerns. We will work with you to address specific issues. Working hours are Monday through Friday 7a - 6p and Saturday 9a-6p.  Please do not hesitate reaching out to any member of the team with any questions, concerns or comments.

  • Please note Binney Street will be closed to eastbound vehicular traffic on Monday October 2nd.
  • The Cinema is open.


  • There are two police details on site between 7a – 3p Monday – Friday. They are stationed on Binney and Cardinal Medeiros and are tasked with assisting pedestrians cross the streets safely.
  • Binney Street is open as a one-way “Share the Road” (bicycles & vehicles) lane going eastbound. Note street closure on Monday October 2 notice above
  • Dust control on the site is ongoing.
  • Wayfinding for cinema and day care is installed. The plaza is closed to all pedestrians. All patrons of the cinema and daycare need to enter through the main garage entrance and follow signage and striping.

The following activity involves the use of heavy construction and trucking equipment and will create noise.

  • Site excavation and hauling work
  • Form and place concrete foundations
  • Foundation rebar deliveries will continue requiring a crane onsite to lower material into the excavation
  • Trucking for removal of material from the site
  • Digging of utility pits on Cardinal Medeiros and Binney Street
  • Utility work in Binney Street

Weekly Construction Update 9/25/17

Neighbors,

 

Below please find an update of the activity at the 399 Binney Street construction site anticipated for next week. Please reach out to a project team member directly with specific concerns. We will work with you to address specific issues. Working hours are Monday through Friday 7a - 6p and Saturday 9a-6p.  Please do not hesitate reaching out to any member of the team with any questions, concerns or comments .


Please note the Cinema is open.

  • There are two police details on site between 7a – 3p Monday – Friday. They are stationed on Binney and Cardinal Medeiros and are tasked with assisting pedestrians cross the streets safely.
  • Binney Street is open as a one-way “Share the Road” (bicycles & vehicles) lane going eastbound.
  •  Dust control on the site is ongoing.
  • Wayfinding for cinema and day care is installed. The plaza is closed to all pedestrians. All patrons of the cinema and daycare need to enter through the main garage entrance and follow signage and striping.

The following activity involves the use of heavy construction and trucking equipment and will create noise.

  • Site excavation and hauling work
  • Form and place concrete foundations
  • Foundation rebar deliveries will continue requiring a crane onsite to lower material into the excavation
  • Trucking for removal of material from the site
  • Digging of utility pits on Cardinal Medeiros and Binney Street
  • Utility work in Binney Street

Weekly Construction Update 9/18/17

Neighbors,

 

Below please find an update of the activity at the 399 Binney Street construction site anticipated for next week. Please reach out to a project team member directly with specific concerns. We will work with you to address specific issues. Working hours are Monday through Friday 7a - 6p and Saturday 9a-6p.  Please do not hesitate reaching out to any member of the team with any questions, concerns or comments.


Please note the Cinema is open.


  • There are two police details on site between 7a – 3p Monday – Friday. They are stationed on Binney and Cardinal Medeiros and are tasked with assisting pedestrians cross the streets safely.
  • Binney Street is open as a one-way “Share the Road” (bicycles & vehicles) lane going eastbound.
  • Dust control on the site is ongoing.
  • Wayfinding for cinema and day care is installed. The plaza is closed to all pedestrians. All patrons of the cinema and daycare need to enter through the main garage entrance and follow signage and striping.

The following activity involves the use of heavy construction and trucking equipment and will create noise.

  • Site excavation and hauling work
  • Form and place concrete foundations
  • Foundation rebar deliveries will continue requiring a crane onsite to lower material into the excavation
  • Trucking for removal of material from the site
  • Digging of utility pits on Cardinal Medeiros and Binney Street
  • Utility work in Binney Street


Weekly Construction Update 9/11/17

Neighbors,

 

Below please find an update of the activity at the 399 Binney Street construction site anticipated for next week. Please reach out to a project team member directly with specific concerns. We will work with you to address specific issues. Working hours are Monday through Friday 7a - 6p and Saturday 9a-6p.  Please do not hesitate reaching out to any member of the team with any questions, concerns or comments.


Please note the Cinema is planning to re-open half of their screens on Friday September 8th, the remaining three screens are anticipated to open next Friday September 15th. Please contact the Cinema directly to confirm operating hours.The Cinema has been closed temporarily out of an abundance of caution while the foundation work of the new development Binney is being completed along the South side of the Cinema. We are using this time to also upgrade the structural components in the Cinema, we apologize for the inconvenience. 

  • There are two police details on site between 7a – 3p Monday – Friday. They are stationed on Binney and Cardinal Medeiros and are tasked with assisting pedestrians cross the streets safely.
  • Binney Street is open as a one-way “Share the Road” (bicycles & vehicles) lane going eastbound.
  • Dust control on the site is ongoing.
  • Wayfinding for cinema and day care is installed. The plaza is closed to all pedestrians. All patrons of the cinema and daycare need to enter through the main garage entrance and follow signage and striping.

The following activity involves the use of heavy construction and trucking equipment and will create noise.

  • Site excavation and hauling work
  • Form and place concrete foundations
  • Foundation rebar deliveries will continue requiring a crane onsite to lower material into the excavation
  • Trucking for removal of material from the site
  • Utility work in Binney Street

Weekly Construction Update 9/4/17

Neighbors,

Below please find an update of the activity at the 399 Binney Street construction site anticipated for next week. Please reach out to a project team member directly with specific concerns. We will work with you to address specific issues. Please see an image (attached) of the logistics plan. Working hours are Monday through Friday 7a - 6p and Saturday 9a-6p.  The site will be closed Monday September 4th. Please do not hesitate reaching out to any member of the team with any questions, concerns or comments.


Please note the Cinema is closed temporarily out of an abundance of caution while the foundation work of the new development Binney is being completed along the South side of the Cinema. We are using this time to also upgrade the structural components in the Cinema, we apologize for the inconvenience. The plan is to re-open half the cinema screens next Friday the 8th and the 3 other screens the following Friday September 15th

  • There are two police details on site between 7a – 3p Monday – Friday. They are stationed on Binney and Cardinal Medeiros and are tasked with assisting pedestrians cross the streets safely.
  • Binney Street is open as a one-way “Share the Road” (bicycles & vehicles) lane going eastbound.
  • Dust control on the site is ongoing.
  • Wayfinding for cinema and day care is installed. The plaza is closed to all pedestrians. All patrons of the cinema and daycare need to enter through the main garage entrance and follow signage and striping.

The following activity involves the use of heavy construction and trucking equipment and will create noise.

  • Site excavation and hauling work
  • Form and place concrete foundations
  • Foundation rebar deliveries will continue requiring a crane onsite to lower material into the excavation
  • Trucking for removal of material from the site
  • Utility work in Binney Street

Weekly Construction Update 8/28/17

Neighbors,

 

Below please find an update of the activity at the 399 Binney Street construction site anticipated for next week. Please reach out to a project team member directly with specific concerns. We will work with you to address specific issues. Please see an image (attached) of the logistics plan. Working hours are Monday through Friday 7a - 4:30p.  Please do not hesitate reaching out to any member of the team with any questions, concerns or comments. Note the cinema will be closed temporarily.

  • There are two police details on site between 7a – 3p Monday – Friday. They are stationed on Binney and Cardinal Medeiros and are tasked with assisting pedestrians cross the streets safely.
  • Binney Street is open as a one-way “Share the Road” (bicycles & vehicles) lane going eastbound.
  • Dust control on the site is ongoing.
  • Wayfinding for cinema and day care is installed. The plaza is closed to all pedestrians. All patrons of the cinema and daycare need to enter through the main garage entrance and follow signage and striping.

The following activity involves the use of heavy construction and trucking equipment and will create noise.

  • Site excavation and hauling work
  • Mobilization of foundation concrete contractor
  • Foundation rebar deliveries will continue requiring a crane onsite to lower material into the excavation
  • Start to form and place concrete foundations
  • Mobilization of waterproofing contractor
  • Trucking for removal of material from the site
  • Utility work in Binney Street

Weekly Construction Update 8/21/17

Neighbors,

 Below please find an update of the activity at the 399 Binney Street construction site anticipated for next week. Please reach out to a project team member directly with specific concerns. We will work with you to address specific issues. Working hours are Monday through Friday 7a - 4:30p. However, as required and allowed by the City, the site will remain open until 6:00pm.  Please do not hesitate reaching out to any member of the team with any questions, concerns or comments.

  • There are two police details on site between 7a – 3p Monday – Friday. They are stationed on Binney and Cardinal Medeiros and are tasked with assisting pedestrians cross the streets safely.
  • Binney Street is open as a one-way “Share the Road” (bicycles & vehicles) lane going eastbound.
  • Dust control on the site is ongoing.
  • Wayfinding for cinema and day care is installed. The plaza is closed to all pedestrians. All patrons of the cinema and daycare need to enter through the main garage entrance and follow signage and striping.


The following activity involves the use of heavy construction and trucking equipment and will create noise.

  • Site excavation and hauling work
  • Mobilization of foundation concrete contractor
  • Start to form and place concrete foundations
  • Mobilization of waterproofing contractor
  • Trucking for removal of material from the site
  • Utility work in Binney Street

Weekly Construction Update 8/14/17

Neighbors,

Below please find an update of the activity at the 399 Binney Street construction site anticipated for next week. Please reach out to a project team member directly with specific concerns. We will work with you to address specific issues. Working hours are Monday through Friday 7a - 4:30p. However, as required and allowed by the City, the site will remain open until 6:00pm.  Please do not hesitate reaching out to any member of the team with any questions, concerns or comments.

  • Please note there will be work on-site this Saturday August 12, 2017
  • There are two police details on site between 7a – 3p Monday – Friday. They are stationed on Binney and Cardinal Medeiros and are tasked with assisting pedestrians cross the streets safely
  • Binney Street is open as a one-way “Share the Road” (bicycles & vehicles) lane going eastbound
  • Dust control on the site is ongoing
  • Wayfinding for cinema and day care is installed. The plaza is closed to all pedestrians. All patrons of the cinema and daycare need to enter through the main garage entrance and follow signage and striping.


The following activity involves the use of heavy construction and trucking equipment and will create noise.

  • Site excavation and hauling work
  • Excavation and installation of drainage piping, hydrant, and structures for the garage
  • Mobilization of foundation concrete contractor
  • Begin to form and place concrete foundations
  • Mobilization of waterproofing contractor
  • Trucking for removal of material from the site
  • Utility work in Binney Street

Weekly Construction Update 8/7/17

Neighbors,

Below please find an update of the activity at the 399 Binney Street construction site anticipated for next week. Please reach out to a project team member directly with specific concerns. We will work with you to address specific issues. Working hours are Monday through Friday 7a - 4:30p. However, as required and allowed by the City, the site will remain open until 6:00pm.  Please do not hesitate reaching out to any member of the team with any questions, concerns or comments.

  • There are two police details on site between 7a – 3p Monday – Friday. They are stationed on Binney and Cardinal Medeiros and are tasked with assisting pedestrians cross the streets safely
  • Binney Street is open as a one-way “Share the Road” (bicycles & vehicles) lane going eastbound
  • Dust control on the site is ongoing
  • Wayfinding for cinema and day care is installed. The plaza is closed to all pedestrians. All patrons of the cinema and daycare need to enter through the main garage entrance and follow signage and striping.

 

The following activity involves the use of heavy construction and trucking equipment and will create noise.

  • Site excavation and hauling work
  • Excavation and installation of drainage piping, hydrant, and structures for the garage
  • Mobilization of foundation concrete contractor
  • Mobilization of waterproofing contractor
  • Trucking for removal of material from the site
  • Utility work in Binney Street

Weekly Construction Update 7/31

Below please find an update of the activity at the 399 Binney Street construction site anticipated for next week. Please reach out to a project team member directly with specific concerns. We will work with you to address specific issues. Working hours are Monday through Friday 7a - 4:30p. However, as required and allowed by the City, the site will remain open until 6:00pm.  Please do not hesitate reaching out to any member of the team with any questions, concerns or comments.

Note: there will be work on-site to drill a test pit for a new water main on Saturday July 29, 2017 with work beginning after 9a. 

  • There are two police details on site between 7a – 3p Monday – Friday. They are stationed on Binney and Cardinal Medeiros and are tasked with assisting pedestrians cross the streets safely
  • Binney Street is open as a one-way “Share the Road” (bicycles & vehicles) lane going eastbound
  • Dust control on the site is ongoing
  • Wayfinding for cinema and day care is installed. The plaza is closed to all pedestrians. All patrons of the cinema and daycare need to enter through the main garage entrance and follow signage and striping.

 

The following activity involves the use of heavy construction and trucking equipment and will create noise.

  • Site excavation and hauling work
  • Excavation and installation of drainage piping, hydrant, and structures for the garage
  • Trucking for removal of material from the site
  • Utility work in Binney Street

Weekly Construction Update 7/24

Neighbors,

 

Below please find an update of the activity at the 399 Binney Street construction site anticipated for next week. Please reach out to a project team member directly with specific concerns. We will work with you to address specific issues. Working hours are Monday through Friday 7a - 4:30p. However, as required and allowed by the City, the site will remain open until 6:00pm.  Please do not hesitate reaching out to any member of the team with any questions, concerns or comments (contact list attached).


Note: there will be work on-site to drill a test pit for a new water main on Saturday July 29, 2017 with work beginning after 9a.  The City has been notified and approved of all weekend work.

  • There are two police details on site between 7a – 3p Monday – Friday. They are stationed on Binney and Cardinal Medeiros and are tasked with assisting pedestrians cross the streets safely
  •  Binney Street is open as a one-way “Share the Road” (bicycles & vehicles) lane going eastbound
  • Dust control on the site is ongoing
  • The garage entry & exit traffic pattern has been adjusted. Please follow signs to ensure safety.
  • Wayfinding for cinema and day care is installed. The plaza is closed to all pedestrians. All patrons of the cinema and daycare need to enter through the main garage entrance and follow signage and striping.

 

The following activity involves the use of heavy construction and trucking equipment and will create noise.

  • Site excavation and hauling work to support the earth retention system     
  • Support of excavation work including material delivery and installation
  • Excavation and installation of drainage piping, hydrant, and structures for the garage
  • Installation of curbing and paving around the garage
  • Installation of garage signage
  • Trucking for removal of material from the site
  • Utility work in Binney Street

Weekly Construction Update 7/17/17

Neighbors,

 

Below please find an update of the activity at the 399 Binney Street construction site anticipated for next week. Please reach out to a project team member directly with specific concerns. We will work with you to address specific issues. Working hours are Monday through Friday 7a - 4:30p.  Please do not hesitate reaching out to any member of the team with any questions, concerns or comments.

Note: there will be paving work on-site this Saturday July 15, 2017.

  • There are two police details on site between 7a – 3p Monday – Friday. They are stationed on Binney and Cardinal Medeiros and are tasked with assisting pedestrians cross the streets safely
  • Binney Street is open as a one-way “Share the Road” (bicycles & vehicles) lane going eastbound
  • Dust control on the site is ongoing
  • The garage entry & exit traffic pattern will be adjusted this week. Please follow signs to ensure safety.
  • Wayfinding for cinema and day care is installed. The plaza is closed to all pedestrians. All patrons of the cinema and daycare need to enter through the main garage entrance and follow signage and striping.

 

The following activity involves the use of heavy construction and trucking equipment and will create noise.

  • Site excavation and hauling work to support the earth retention system     
  • Support of excavation work including material delivery and installation
  • Excavation and installation of drainage piping, hydrant, and structures for the garage
  • Installation of curbing and paving around the garage
  • Installation of garage signage
  • Trucking for removal of material from the site
  • Utility work in Binney Street

Weekly Construction Update 7/10/17

Below please find an update of the activity at the 399 Binney Street construction site anticipated for next week. Please reach out to a project team member directly with specific concerns. We will work with you to address specific issues. Working hours are Monday through Friday 7a - 4:30p.  Please do not hesitate reaching out to any member of the team with any questions, concerns or comments (contact list in Info section).

 

  • There are two police details on site between 7a – 3p Monday – Friday. They are stationed on Binney and Cardinal Medeiros and are tasked with assisting pedestrians cross the streets safely
  • Binney Street is open as a one-way “Share the Road” (bicycles & vehicles) lane going eastbound
  • Dust control on the site is ongoing
  • Wayfinding for cinema and day care is installed. The plaza is closed to all pedestrians. All patrons of the cinema and daycare need to enter through the main garage entrance and follow signage and striping.
  • Note that there will be an adjustment to the garage entry and exit pattern in the coming weeks. We will post a revised logistics plan when the changes occur.

 

The following activity involves the use of heavy construction and trucking equipment and will create noise.

  • Site excavation and hauling work to support the earth retention system     
  • Support of excavation work including material delivery and installation
  • Excavation and installation of drainage piping, hydrant, and structures for the garage
  • Installation of curbing and paving around the garage
  • Installation of garage signage
  • Trucking for removal of material from the site
  • Utility work in Binney Street

Weekly Construction Update 7/3/17


Below please find an update of the activity at the 399 Binney Street construction site anticipated for next week. Please reach out to a project team member directly with specific concerns. We will work with you to address specific issues. Working hours are Monday through Friday 7a - 4:30p.  Please do not hesitate reaching out to any member of the team with any questions, concerns or comments.

  • There will be an early morning / late night crane removal either Friday 6/30 or Saturday 7/1 due to the oversize load
  • There are two police details on site between 7a – 3p Monday – Friday. They are stationed on Binney and Cardinal Medeiros and are tasked with assisting pedestrians cross the streets safely
  • Binney Street is open as a one-way “Share the Road” (bicycles & vehicles) lane going eastbound
  • Dust control on the site is ongoing
  • Wayfinding for cinema and day care is installed. The plaza is closed to all pedestrians. All patrons of the cinema and daycare need to enter through the main garage entrance and follow signage and striping.
  • Note that there will be an adjustment to the garage entry and exit pattern in the coming weeks. We will post a revised logistics plan when the changes occur.


The following activity involves the use of heavy construction and trucking equipment and will create noise.

  • Site excavation and hauling work to support the earth retention system     
  • Support of excavation work including material delivery and installation
  • Excavation and installation of drainage piping and structures for the garage
  • Trucking for removal of material from the site
  • Utility work in Binney Street


Weekly Construction Update 6/26/17

Below please find an update of the activity at the 399 Binney Street construction site anticipated for next week. Please reach out to a project team member directly with specific concerns. We will work with you to address specific issues. Working hours are Monday through Friday 7a - 4:30p.   

  • There are two police details on site between 7a – 3p Monday – Friday. They are stationed on Binney and Cardinal Medeiros and are tasked with assisting pedestrians cross the streets safely
  • Binney Street is open as a one-way “Share the Road” (bicycles & vehicles) lane going eastbound
  • Dust control on the site is ongoing
  • Wayfinding for cinema and day care is installed. The plaza is closed to all pedestrians. All patrons of the cinema and daycare need to enter through the main garage entrance and follow signage and striping.
  • Note that there will be an adjustment to the garage entry and exit pattern in the coming weeks. We will post a revised logistics plan when the changes occur.

The following activity involves the use of heavy construction and trucking equipment and will create noise.

  • Site excavation and hauling work to support the earth retention system     
  • Support of excavation work including material delivery and installation
  • Excavation and installation of drainage piping and structures for the garage
  • Trucking for removal of material from the site
  • Utility work in Binney Street

Please do not hesitate reaching out to any member of the team with any questions, concerns or comments (contact list in Info tab).


Weekly Construction Update 6/19/17

The sheeting work for the foundation is complete! Thank you for your patience and understanding during this phase of construction. A special thank you goes out to the on-site crews for finishing the work as quickly as possible.


Below please find an update of the activity at the 399 Binney Street construction site anticipated for next week. Please reach out to a project team member directly (see Construction Project Team Contact List in the Info section) with specific concerns. We will work with you to address specific issues. Please see an image (attached) of the logistics plan. Working hours are Monday through Friday 7a - 4:30p.  Please do not hesitate reaching out to any member of the team with any questions, concerns or comments.


  • There are two police details on site between 7a – 3p Monday – Friday. They are stationed on Binney and Cardinal Medeiros and are tasked with assisting pedestrians cross the streets safely
  • Binney Street is open as a one-way “Share the Road” (bicycles & vehicles) lane going eastbound
  • Dust control on the site is ongoing
  • Wayfinding for cinema and day care is installed. The plaza is closed to all pedestrians. All patrons of the cinema and daycare need to enter through the main garage entrance and follow signage and striping.


The following activity involves the use of heavy construction and trucking equipment and will create noise.

  • Site excavation and hauling work to support the earth retention system
  • Support of excavation work including material delivery and installation
  • Excavation and installation of drainage piping and structures for the garage
  • Trucking for removal of material from the site
  • Utility work in Binney Street

Weekly Construction Update 6/12/17

Below please find an update of the activity at the 399 Binney Street construction site anticipated for next week. Note that the construction work for the foundation system has begun. Please reach out to a project team member directly (see attached Construction Project Team Contact List) with specific concerns. We will work with you to address specific issues. Please see an image (attached) of the logistics plan. Working hours are Monday through Friday 7a - 4:30p.  Please do not hesitate reaching out to any member of the team with any questions, concerns or comments (contact list attached).


  • There are two police details on site between 7a – 3p Monday – Friday. They are stationed on Binney and Cardinal Medeiros and are tasked with assisting pedestrians cross the streets safely
  • New pedestrian signage has been installed along Cardinal Medeiros to improve safety
  • Binney Street is open as a one-way “Share the Road” (bicycles & vehicles) lane going eastbound
  • Dust control on the site is ongoing
  • Wayfinding for cinema and day care is installed. The plaza is closed to all pedestrians. All patrons of the cinema and daycare need to enter through the main garage entrance and follow signage and striping.


The following activity involves the use of heavy construction and trucking equipment and will create noise.

  • Support of excavation work including material delivery and installation
  • Pre-trenching around the site.
  • Excavation and installation of drainage piping and structures for the garage. 
  • Trucking for removal of material from the site
  • Utility work in Binney Street


Construction Weekly Update 6/5/17

Below please find an update of the activity at the 399 Binney Street construction site anticipated for next week. Note that the construction work for the foundation system has begun. Please reach out to a project team member directly (see Info tab "Construction Project Team Contact List") with specific concerns. We will work with you to address specific issues. Please see an image (attached) of the logistics plan. Working hours are Monday through Friday 7a - 4:30p.  Please do not hesitate reaching out to any member of the team with any questions, concerns or comments.


  • There are two police details on site between 7a – 3p Monday – Friday. They are stationed on Binney and Cardinal Medeiros and are tasked with assisting pedestrians cross the streets safely
  • New pedestrian signage has been installed along Cardinal Medeiros to improve safety
  • Binney Street is open as a one-way “Share the Road” (bicycles & vehicles) lane going eastbound
  • Dust control on the site is ongoing
  • Wayfinding for cinema and day care is installed. The plaza is closed to all pedestrians. All patrons of the cinema and daycare need to enter through the main garage entrance and follow signage and striping.


The following activity involves the use of heavy construction and trucking equipment and will create noise.

  • Support of excavation work including material delivery and installation
  • Pre-trenching around the site.
  • Excavation and installation of drainage piping and structures for the garage. 
  • Trucking for removal of material from the site
  • Relocated garage entry paving
  • Utility work in Binney Street

Construction Start Notice & Weekly Update 5/29/17

Please note that excavation and foundation work will begin tomorrow, Thursday May 25, 2017.

Below please find an update of the activity at the 399 Binney Street construction site anticipated for next week. Note that the construction work for the foundation system has begun. Please see an image (attached) of the logistics plan. Working hours are Monday through Friday 7a - 4:30p.  Please do not hesitate reaching out to any member of the team with any questions, concerns or comments (contact list attached).


  • There will be no work onsite Monday May 29, 2017 due to the Memorial Day holiday.
  • There are two police details on site between 7a – 3p Monday – Friday. They are stationed on Binney and Cardinal Medeiros and are tasked with assisting pedestrians cross the streets safely
  • New pedestrian signage has been installed along Cardinal Medeiros to improve safety
  • Binney Street is open as a one-way “Share the Road” (bicycles & vehicles) lane going eastbound
  • Dust control on the site is ongoing
  • Wayfinding for cinema and day care is installed. The plaza is closed to all pedestrians. All patrons of the cinema and daycare need to enter through the main garage entrance and follow signage and striping.


The following activity involves the use of heavy construction and trucking equipment and will create noise.

  • Mobilization of support of excavation equipment by the site work contractor.
  • Begin support of excavation work including material delivery and installation
  • Pre-trenching around the site.
  • Excavation and installation of drainage piping and structures for the garage. 
  • Relocated garage entry paving

Weekly Construction Update 5/22/17

Below please find an update of the activity at the 399 Binney Street construction site anticipated for next week. Note that the construction work for the foundation system will begin. Please see an image (attached) of the updated logistics plan that has been installed. Working hours are Monday through Friday 7a - 4:30p.  Please do not hesitate reaching out to any member of the team with any questions, concerns or comments.


  • There are two police details on site between 7a – 3p Monday – Friday. They are stationed on Binney and Cardinal Medeiros and are tasked with assisting pedestrians cross the streets safely
  • New pedestrian signage has been installed along Cardinal Medeiros to improve safety
  • Binney Street is open as a one-way “Share the Road” (bicycles & vehicles) lane going eastbound
  • Dust control on the site is ongoing
  • Wayfinding for cinema and day care is installed. The plaza is closed to all pedestrians. All patrons of the cinema and daycare need to enter through the main garage entrance and follow signage and striping.


The following activity involves the use of heavy construction and trucking equipment and will create noise.

  • Mobilization of support of excavation equipment by the site work contractor.
  • Begin support of excavation work including material delivery and installation
  • Pre-trenching around the site.
  • Excavation and installation of drainage piping and structures for the garage. 
  • Paving at the garage relocated entry location

Weekly Construction Update 5/15/17

Below please find an update of the activity at the 399 Binney Street construction site anticipated for next week. Note that the construction work for the foundation system will begin. Please see an image (attached) of the updated logistics plan that has been installed. Working hours are Monday through Friday 7a - 4:30p.  Please do not hesitate reaching out to any member of the team with any questions, concerns or comments.

NOTE: We were informed by the DPW of upcoming work involving a crane during the weekend of May 13th and 14th. Per the DPW, the section of Binney St outside of the site will be closed to eastbound traffic and opened to westbound traffic for Saturday and Sunday only!! This is due to crane work on Galileo Way, unrelated to our project, and the need to detour vehicles. The lane will be re-opened to eastbound traffic only on Monday 5/15. This work is weather dependent so may be delayed accordingly.


·        There are two police details on site between 7a – 3p Monday – Friday. They are stationed on Binney and Cardinal Medeiros and are tasked with assisting pedestrians cross the streets safely.

·        Binney Street is open as a one-way “Share the Road” (bicycles & vehicles) lane going eastbound

·        Dust control on the site is ongoing

·        Wayfinding for cinema and day care is installed. The plaza is closed to all pedestrians. All patrons of the cinema and daycare need to enter through the main garage entrance and follow signage and striping.


The following activity involves the use of heavy construction and trucking equipment and will create noise.

·        Mobilization of support of excavation equipment by the site work contractor.

·        Begin support of excavation work including material delivery and installation

·        Pre-trenching around the site.

·        Excavation and installation of drainage piping and structures for the garage. 

·        Paving at the garage relocated entry location

Weekly Construction Update 5/8/17

Below please find an update of the activity at the 399 Binney Street construction site anticipated for next week. Note that the construction work for the foundation system will begin. Please see an image (attached) of the updated logistics plan that has been installed. Working hours are Monday through Friday 7a - 4:30p.  Please do not hesitate reaching out to any member of the team with any questions, concerns or comments (contact list attached).

·        There are two police details on site between 7a – 3p Monday – Friday. They are stationed on Binney and Cardinal Medeiros and are tasked with assisting pedestrians cross the streets safely.

·        Binney Street is open as a one-way “Share the Road” (bicycles & vehicles) lane going eastbound

·        Dust control on the site is ongoing

·        Wayfinding for cinema and day care is installed. The plaza is closed to all pedestrians. All patrons of the cinema and daycare need to enter through the main garage entrance and follow signage and striping.

The following activity involves the use of heavy construction and trucking equipment and will create noise.

·        A piece of heavy equipment is scheduled to arrive Monday morning at the site before 7a due to its size and mandated roadway precautions.

·        Mobilization of support of excavation equipment by the site work contractor.

·        Begin support of excavation work including material delivery and installation

·        Pre-trenching around the site.

·        Excavation and removal of below grade structures within the site.

·        Excavation and installation of drainage piping and structures for the garage. 

·        Paving at the garage relocated entry location

Weekly Construction Update 4/24/17

Neighbors,

Thanks to those that joined us last night! Below please find an update of the activity at the 399 Binney Street construction site anticipated for next week. Please see an image (attached) of the updated logistics plan that has been installed. Working hours are Monday through Friday 7a - 4:30p.  Please do not hesitate reaching out to any member of the team with any questions, concerns or comments (contact list attached).


·        There are two police details on site between 7a – 3p Monday – Friday. They are stationed on Binney and Cardinal Medeiros and are tasked with assisting pedestrians cross the streets safely.

·        Binney Street is open as a one-way “Share the Road” (bicycles & vehicles) lane going eastbound

·        Dust control on the site is ongoing

·        Wayfinding for cinema and day care is installed. The plaza is closed to all pedestrians. All patrons of the cinema and daycare need to enter through the main garage entrance and follow signage and striping.


The following activity involves the use of heavy construction and trucking equipment and will create noise.

·        Mobilization of equipment by the site work contractor.

·        Pre-trenching around the site.

·        Importing material to begin to level the site may occur.

·        Excavation and removal of below grade structures within the site.

·        Excavation and installation of drainage piping and structures for the garage. 

·        Fencing will be installed around the Garage exit work zone


Weekly Construction Update 4/17

Please join us at from 7:00p - 8:00p on Thursday, April 20th at the Dante Alighieri Society Building located at the corner of Hampshire Street and Cardinal Medieros Avenue for an in-person 399 Binney Street Construction Update. All are welcome. Light refreshments will be served.

Below please find an update of the activity at the 399 Binney Street construction site anticipated for next week. Please see an image (attached) of the updated logistics plan that has been installed. Working hours are Monday through Friday 7a - 4:30p.  Please do not hesitate reaching out to any member of the team with any questions, concerns or comments (contact list attached).

  • There are two police details on site between 7a – 3p Monday – Friday. They are stationed on Binney and Cardinal Medeiros and are tasked with assisting pedestrians cross the streets safely.
  • Binney Street is open as a one-way “Share the Road” (bicycles & vehicles) lane going eastbound
  • Dust control on the site is ongoing
  • Wayfinding for cinema and day care is installed. The plaza is closed to all pedestrians. All patrons of the cinema and daycare need to enter through the main garage entrance and follow signage and striping.

The following activity involves the use of heavy construction and trucking equipment and will create noise.

  • Mobilization of equipment by the site work contractor.
  • Pre-trenching around the site.
  • Importing material to begin to level the site may occur.
  • Excavation and removal of below grade structures within the site.
  • Excavation and installation of drainage piping and structures for the garage. 
  • Fencing will be installed around the Garage exit work zone