Update #25

Path of Travel Change: October 2019

The 15th Street sidewalk closest to 1550 Crystal Drive building will close for pedestrian traffic on/or approximately Monday, October 14th. All pedestrian traffic will need to utilize the opposite sidewalk on 15th Street and cross at the cross walk adjacent to South Bell Street to access 1550 Crystal Drive.

Additionally, the current pedestrian path of travel near the Crystal Square Apartments will be flipped back to its original path of travel crossing at the apartments main entrance doors.

Please see below drawing and attached flyer for this new path of travel.