Kendall Square at MIT

Cambridge, MA
Official construction updates during the creation of 1 million square feet of new space in Kendall Square.
Developer
Phase
Construction
Open Space
Over 1.8 acres
retail
115,000 SQ FT
office
/ R&D 888,000 SQ FT
residential
450 grad & 290 other
View all updates

Construction Update: August 3rd - August 18th

Street and Sidewalk Impacts

Wadsworth Street –The street will remain closed between Amherst Street and Memorial Drive (between Buildings E51 and E52) 24 hours a day to vehicular traffic. We anticipate the closure to remain in place until late August. Vehicles on Memorial Drive should access the Kendall Square area via Ames Street. For the duration of excavation and installation Wadsworth Street will remain closed as a location for equipment set up and staging. (W1).

Utility exploratory work will occur on the corner of Wadsworth and Amherst Streets (W2). Pedestrian and vehicular traffic will be maintained during this work.

Carleton Street – Utility work on the street includes chilled water (C1) and gas line (C2) installation. Carleton Street will remain open to vehicular traffic from Amherst Street to the Medical Parking Lot.

MBTA Main Street Plaza – The pedestrian plaza connecting Carleton Street to the inbound Kendall Square MBTA Station on Main Street is closed fully for the duration of the project to allow construction of an underground garage in this area. Pedestrians will be guided to seek alternate paths to and from the station using Ames Street, Dock Street, or Wadsworth Street. (M1)

Access to the MBTA station and elevator will remain open and accessible on the Main Street side of the station throughout this work.

General Construction Update

Work continues on the Kendall Garage behind 290-292 Main (E38-E39), and 238 Main (E48). This includes: 

  • Slurry Wall (Support of the Excavation) installation.
  • Daily deliveries of steel and concrete.
  • Daily trucking to remove material from the site.

Pre-trenching for the slurry wall and sheeting installation will continue on site 5. This work may create noise and vibration in the immediate area.

E38 Interior and exterior renovation activities will continue.

E39 Foundation activities will continue.

Police details will be utilized throughout the project area to assist with pedestrian and vehicular traffic.

Saturday Work – General construction activities will continue on Saturdays. Work will occur within the City of Cambridge allowable work hours, 9:00 am to 6:00 pm.